background image

65LB Professional 

Ice Melt Spreader 

MODEL # 90365 

ASSEMBLY INSTRUCTIONS 

 

90365Ice Melt Spreader_M52162 JULY 2021

 

PAGE 2

 

 
Assembly Steps 
STEP 1:

 

Open carton and remove the handle assembly, 

wheels, and spreader from carton.  

 

STEP 2:  

Turn spreader upside-down on to the hopper. 

 
 
 
 
 

 

 

STEP 3:  

Ensure that the axle bearings are pushed into the 

axle bushing on both sides as shown.  Install drive wheel 

(both wheels are interchangeable) to axle using pin hole 

nearest to lower handles as shown.  Insert 2” cotter pin 

through wheel and through axle. Bend with pliers to prevent 

pin from falling out.

 

 
 

 

 

 
 
 

 

 

STEP 4:

 Install coast wheel to axle, then using outside pin hole 

as shown, insert 1” cotter pin through axle (not thru the 

wheel).  Bend with pliers to prevent pin from falling out.  

 

 

 

 

 

 

 

 

 

GEARBOX &

 

AXLE ASSEMBLY

 

Lower 

 

Handle

 

Frame 

 

Brace

 

Cross Brace

 

Axle

 

Bearing

 

Summary of Contents for Polar Tech 90365

Page 1: ...team is standing ready to ensure your success Please contact us at www EarthWay com to see our full line of commercial lawn garden tools NOTE The large opening is designed to allow ice melt to flow through spreader without the need for an agitator This unit is not designed for fertilizer For spreading fertilizer please select the right tool an EarthWay precision fertilizer spreader 20 x 1 20 x 1 1...

Page 2: ... pushed into the axle bushing on both sides as shown Install drive wheel both wheels are interchangeable to axle using pin hole nearest to lower handles as shown Insert 2 cotter pin through wheel and through axle Bend with pliers to prevent pin from falling out STEP 4 Install coast wheel to axle then using outside pin hole as shown insert 1 cotter pin through axle not thru the wheel Bend with plie...

Page 3: ...LAST Now slide the UPPER HANDLE assembly over the HANDLE SHAFT on the end with the bolt holes closer to the end Install gauge lever using 2 2 bolts Be sure gauge is on left hand side Tighten locknuts to gauge first TIGHTEN ALL HARDWARE NOW Step 7 Install Control Rod by inserting flattened end of Control Rod into Lever on Gauge as shown Turn to lock in place Make sure that there is a plain 20 Hex N...

Page 4: ...09 Maple Street Bristol IN 46507 ONE YEAR WARRANTY EarthWay Products Inc warrants this product free of defects in original workmanship and materials for a period of one year to the end user with the original purchase receipt If a manufacturing non conformance is found EarthWay Products Inc at its discretion will repair or replace the part s product at no charge provided the failure is not the resu...

Page 5: ...ES PART DESCRIPTION 1 40003 HOPPER ASSEMBLY KIT 2 1 2 6 8 60175 OPERATOR T HANDLES 2 99342 HOPPER ASSEMBLY KIT 2 1 2 6 9 60333 GEARBOX IMPELLER SHAFT KIT 9 1 9 2 3 38144 HARDWARE KIT 3 1 3 92 10 12110 IMPELLER 4 60266 CONTROL KIT X BRACE KIT 4 1 4 5 11 70138 13 PNEUMATIC TIRE 5 60603 LOWER FRAME ASSY KIT 5 1 5 6 4 3 60298 GAUGE LEVER ASSEMBLY 6 25222 HANDLE TO FRAME AXLE ARMS 6 1 6 2 12 77003 HEAV...

Reviews: