background image

CALIBRATION INSTRUCTIONS:

 

Loosen set-screw on Calibration 
Bracket

 

Set adjustment dial to “0” Closed

 

Activate switch to extend to the 
“STOP” 

 

Slide Calibration Bracket to 
ensure shut-off is closed

 

Calibration is now complete

To Calculate RATE SETTINGS:

 

Determine how much material is to be applied 
per 1,000 sq./ft.

 

Measure off a distance of 50 feet, preferably on a paved surface such as a parking lot.

 

Weigh out enough of the material to be applied to fill the hopper at least half full. Record the weight for 
future use.

 

With the unit mounted on the vehicle and the hopper at least half full of the material to be spread, posi-
tion the vehicle far enough before the beginning of the 50 foot test area so that the vehicle will achieve the 
desired speed before you reach the starting line.

 

Select the Setting Rate position that you feel would be an appropriate setting on the ECM Module 1-10.  

IMPORTANT - only make Rate Adjustments with the shut-off in the CLOSED POSITION

 

Start the vehicle in motion and as you cross the starting line (of the 
50 feet) move the rate lever to the open position against the stop. 
Take care to be aware of what is going on around you maintaining 
control of the vehicle.

 

Continue from the starting line with the unit spreading the material. 
As you cross the finish line move the rate lever to the closed posi-
tion.

 

Stop the vehicle and note the width of the spread path that was just 
completed.

 

Return to the start point and empty the remaining material from 
the hopper into your weighing container and re-weigh.

OPERATING  INSTRUCTIONS:

Before filling hopper, become familiar with the operation of this 
spreader.  
(Practice the following steps)

 

Turn the motor switch to the ON POSITION, so that the impeller is 
turning before going on to the next step.

 

While driving forward turn the ECM Control switch (wide top switch) to the ON POSITION, this opens the 
shut off plate on the spreader.

 

To stop the flow of material, turn the ECM Control switch to the OFF POSITION, then turn the motor off 
when finished.

 

When finished empty any remaining material from hopper.

 

Thoroughly wash spreader and allow to dry before storing.  Lubricate all moving parts with a graphite or 
silicon spray.

Step 3

Step 4

EarthWay

®

To Calibrate loosen set screw

slide Calibration Bracket

Install Calibration Bracket to ECM 
shaft by sliding the Calibration Bracket
on to the ECM shaft.

M80 Side

M40 Side

To install Calibration Bracket you must
determine which leg corresponds to your
spreader.  Short for M40, and long
for M80

Install Control Rod on to Shut-Off from
the top down and secure with small Hair Pin Clip.
Then attach the other end of the Control Rod to the 
Calibration Bracket from the bottom up.

Tip: 

You may need to retract ECM to fully 

closed “0” to aid in installing the Calibration 
Bracket

SLIDE

Motor 

Connection

C L

 O S

 E D         O P E N

Turn

ECM Rate Adjustment

 1  1 

 1  0 

8  7

  6  5  4  3  2 

0

Reviews: