Assembly and Operation Instructions
F80_REVMARCH2024
PAGE 8
HANDLE ADJUSTMENT INSTRUCTIONS
TALL OPERATOR CONFIGUATION – with the four handle holes, use the bottom two holes for the guage and use the top two holes for the spacer.
Page 1: ...ler PRIOR TO ASSEMBLY YOU WILL NEED 7 16 Wrench Ratchet 7 16 Socket Pliers HELPFUL HINTS Read the directions before assembly If your spreader does not spread evenly be sure FRONT on the GEARBOX points...
Page 2: ...Step 4 Slide AXLE BUSHING onto AXLE and into AXLE BEARING to both sides as shown in the bottom right image Step 5 Next take the spreader and move it so the logo on the front of the hopper is facing a...
Page 3: ...UTS NOW Step 11 Remove one 1 4 20 Hex Nut from the CONTROL ROD Next push LEVER forward to setting 0 to help align the CONTROL ROD with hole in PIVOT BRACKET pull LEVER backward to insert CONTROL ROD t...
Page 4: ...om hopper rinse spreader apply coating of light oil to all metal parts The gearbox is sealed and is factory lubricated The SideSpread Control is a patented innovation that is superior to side deflecto...
Page 5: ...he hole use a Phillips screwdriver to remove the burr Pliers may be required to help squeeze the PIVOT ROD into the CLIP Step 5 When the ROD is secure inside the CLIP push the free end of the CLIP ove...
Page 6: ...Assembly and Operation Instructions F80_REVMARCH2024 PAGE 6...
Page 7: ...without moving it and then carefully tighten each nut fully so they do not loosen during use Recheck adjustment as outlined above STANDARD OUTPUT TRAY Make sure the drop holes in the bottom of the ho...
Page 8: ...Operation Instructions F80_REVMARCH2024 PAGE 8 HANDLE ADJUSTMENT INSTRUCTIONS TALL OPERATOR CONFIGUATION with the four handle holes use the bottom two holes for the guage and use the top two holes fo...
Page 9: ...Assembly and Operation Instructions F80_REVMARCH2024 PAGE 9 HOW TO ORDER PARTS Call or Email TURF DEPOT 800 305 9255 or earthway turfdepot com...
Page 10: ...4 20 X 2 1 4 HHCS ZINC 15 31120 1 4 20 X 2 HHCS ZINC 16 32100 1 4 20 HEX NUT ZINC 17 60300 PIVOT BRACKET ASSEMBLY 18 F13105 HOPPER 19 32103 1 4 20 NYLON LOCKNUT ZINC 20 60175 UPPER HANDLE SQUARE W GRI...
Page 11: ...ction to enforce this limited warranty Any action to enforce any portion of this limited warranty must be commenced within ninety days after the expiration of the limited warranty coverage period Any...