![Earthsafe M500 Installation, Operation And Maintenance Manual Download Page 12](http://html1.mh-extra.com/html/earthsafe/m500/m500_installation-operation-and-maintenance-manual_521379012.webp)
12 of 15
earth safe
Fuel Systems for Critical Power
Operation
1. Day Tank controller operation.
Refer to Controller manual for details of day tank operations.
Maintenance
1. Inspect for leaks at regular intervals, weekly as a minimum.
2. Operate pump manually to confirm prime at regular intervals, monthly as a minimum.
3. Check strainers after initial use and clean if required.
4. Periodically check the day tank refill function by lowering the day tank fuel level and
observing the re-fill function.
5. On annual basis also check the day tank high, low, and leak alarms.
EMERGENCY POWER FUEL SYSTEMS
Earthsafe M500
Generator Day Tank
INSTALLATION, OPERATION, AND MAINTENANCE