目录
www.eardatek.com
Installation
Appendix
Preparation for Installation
Check List
Part 1 Antenna Installation Site (ADU Preparation)
Part 2 ACU and Modem (BDU Preparation)
1
2
13
19
20
21
18
16
17
Step 1 Mounting Antenna
Step 2 Connection Diagram
Step 3 Confirm All Connections
Step 4 ACU Setting Procedure
Step 5 Antenna Operating Status
Step 6 Setting LAT and LNG
Step 7 Fixed Station Locking
Step 8 Testing Microwave Link
1-ACU Operation Guide
2-Upgrade
3-Troubleshooting Guide
4-Block Diagram Inside Radome
5-Radome Dimension
6-Specification-M8
14
15
24
27
32
42
43
44