background image

CREATED ON: April 30, 2016

 

 

1.

 

Top Display Window 

2.

 

Bottom Display Window 

3.

 

Previous button 

4.

 

Scroll/Hold button 

5.

 

Next button 

6.

 

Select button 

7.

 

Advance button 

8.

 

Pulse Constant 

                                                

Instruction Manual

 

 

 

 

 

EMS-09 V4.0 

Basic / Energy METER 

  

                                         

 

                            

 

                                                                      

                                                            

EAPL

 

 

 

Introduction 

  
 
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

*  : R,Y,B/Total

 

 

Box Accessories

 

 One (1) EMS-09 digital meter         
One (1) Instruction Manual 
One (1) test and Calibration certificate for energy meter   
Side Anchor (2 nos.) 

PARAMETERS

 

V

PP

*

, V

PN

*

 

I

PF

Hz 

W* 

KWh

 

MWh 

LOAD HOURS 

KWh(Old)

 

MWh(Old) 

LOAD HOURS (Old)) 

Device ID 

 

 
Safety Precautions

 

Read and follow all the safety precautions and instructions before installing 
and working with the equipment. 

                           !   

DANGER 

HAZARD OF ELECTRIC SHOCK, EXPLOSION OR ARC FLASH 

 

Apply appropriate personal protective equipment(PPE) and follow safety 
work practices 

 

Only qualified electrical workers should install this equipment. Such work 
should be performed only after reading this entire set of instructions. 

 

If the equipment is not used in the manner specified by the 
manufacturer, the protection provided by the equipment may be 
impaired. 

 

NEVER work alone. 

 

Turn OFF all power supplying the energy meter and the equipment in 
which it is installed before working on it. 

 

The successful operation of this equipment depends upon proper 
handling, installation and operation. Neglecting fundamental installation 
requirements may lead to personal injury as well as damage to electrical 
equipment or other property. 

 

NEVER bypass external fusing.

 

 

 

NEVER short the secondary of PT 

 

NEVER open circuit a CT; use the shorting block to short circuit the leads 
of CT before removing the connection from energy meter. 

 

Before performing Dielectric or Megger testing on any equipment in 
which the energy meter is installed, disconnect all the input and output 
wires to the energy meter. High voltage testing may damage electronic 
components contained in the energy meter. 

 

The energy meter should be installed in a suitable electrical enclosure. 

Failure to follow these instructions will result in death or serious injury.

 

 

EAPL is not responsible for any consequential damages arising out of

  

 

use of our products, though the technology is cautiously chosen and 
implemented like any other well designed good electric meter. 

 

Installation

 

Connecting cable recommendations

 

 

Insulation rating 

Current rating 

Voltage circuit 

>600 VAC 

> 0.1A 

Current circuit 

>600 VAC 

>7.5A/2.5mm

2

14AWG minimum 

 

Tools and Fasteners 

Kindly use star – type screw driver for tightening the screws. 
 

NOTE:

 Installation should include a disconnecting device, like switch or 

circuit breaker, with clear ON/OFF markings, to turn-off the auxiliary 
supply (control power).The disconnecting device should be within the 
reach of the equipment and the operator

.

 

 

 

Dimension 

      

 

 

 

 

 

 

 

 

 

Note: All Dimensions are in mm. 

 

Front Panel 

 

 

 

 

Rear Panel 

 
 

OD RE YN 390011 REV 02/30-04-16

 

Page 1 of 2 

Reviews: