background image

- 7 - 

 

4. Operation 

 

4.1 Standard Operation 

 

Prior to operating the machine, please confirm that 

1.

 

The proper voltage is being supplied to the motor 

2.

 

All fasteners and protective covers are securely in place 

3.

 

All electronic components are dry 

 

Machine Operation 

1.

 

Plug the machine into the power source 

a.

 

DO NOT hard wire the machine to the power source 

2.

 

Activate air supply 

3.

 

Place carton to be erected onto feeder pushing board 

a.

 

Operator must fold the front and rear bottom flaps while loading carton onto the feeder. 

4.

 

Press the green button or depress foot pedal to activate bottom flap folding mechanism and 

carton feed. 

 

 

 

TURN OFF MACHINE AND DISCONNECT IT FROM THE POWER 

SOURCE PRIOR TO PERFORMING ANY MAINTENANCE OR SERVICE

 

 

 

4.2 Adjustable Work Height 

 

Put the nut plate into the leg support according to the 

figure. 

 

Then loosely connect the fastening piece and the nut plate 

with the socket head cap screws. Insert the leg between 

the leg support and nut plate. The leg can now be adjusted 

up and down as desired. Tighten the screws. 

 

The working height should be set such that the operator is 

able to comfortably reach the roller table while maintaining 

approximately 4in (100mm) of distance from the machine. 

 

 

Summary of Contents for T10CF

Page 1: ... 1 Operations Manual Eagle T10CF Carton Erector READ ALL INSTRUCTIONS CONTAINED IN THIS MANUAL PRIOR TO MACHINE INSTALLATION ...

Page 2: ... Shelf 5 3 5 Carton Feeder 6 3 6 Power Supply 6 4 Operation 4 1 Standard Operation 7 4 2 Adjustable Work Height 7 5 Maintenance Troubleshooting 5 1 Regular Maintenance Cleaning 8 5 2 Lubrication 8 6 Illustrations Parts List 6 1 Main Frame Components 9 6 2 Carton Feeder Assembly 11 6 3 Left Right Coupling Assembly 12 6 4 Carton Clamping Assembly 13 6 5 Electrical Diagram 14 ...

Page 3: ...eramics produce meats poultry Prior to setting up the machine 1 Verify the model number matches the model number addressed in this manual 2 Verify that no parts of the machine have been removed or are missing 3 Remove all packaging or shipping materials used during transport or storage of the machine 4 Check for any damage that may have occurred during shipping or transport Prior to operating the ...

Page 4: ...hase Air Consumption 1 cfm 80 psi 6kg f m3 Carton Length 6 26in Carton Width 5 18 5in Carton Height 5 5 20in Machine Length 59 5in Machine Width 35 5in Machine Height 35in Weight 180lbs Operational Environment 32 104ºF 0 40ºC 98 Humidity Machine Noise Levels 75db ...

Page 5: ...s onto the machine Set each leg to the same height to ensure the machine is level when placed onto the ground The working height should be set such that the operator is able to comfortably operate the machine while maintaining approximately 1 2in 10mm of distance from the machine 3 3 Air Line Filter 1 Connect air source 2 Adjust regulator to 4 6 5 bars of air pressure 3 Adjust for proper carton fe...

Page 6: ...for carton length Once adjusted to the proper setting release the knob to fix the feeder into position 3 6 Power Supply Connect the machine to the power supply Note Prior to connecting the machine to the power supply verify that the power switch is set to the OFF position and that the work area is clean and clear of any items ...

Page 7: ...nto the feeder 4 Press the green button or depress foot pedal to activate bottom flap folding mechanism and carton feed TURN OFF MACHINE AND DISCONNECT IT FROM THE POWER SOURCE PRIOR TO PERFORMING ANY MAINTENANCE OR SERVICE 4 2 Adjustable Work Height Put the nut plate into the leg support according to the figure Then loosely connect the fastening piece and the nut plate with the socket head cap sc...

Page 8: ...Y MAINTENANCE OR SERVICE 5 1 Regular Maintenance Cleaning 1 Check all bolts and screws regularly to ensure smooth malfunction free operation of the machine 2 Lubricate moving parts of the machine on a regular basis 3 Clean the machine surfaces 5 2 Lubrication 1 The bottom drive chain should be lubricated once a week ...

Page 9: ... M5 1 5 Bearer FJ HK 47 1 6 Pushing Carton Component 1 7 Pendulum FJ HK 45 2 8 Support Base FJ HK 27 2 9 Spacer Bush FJ HK 26 4 10 Change Valve VZ 3 PK 3 1 11 Manual Valve S3PM 06 R 1 12 Valve Cover FJ HK 60 1 13 Valve Mounting Panel FJ HK 07 1 14 Back Closing Plate FJ HK 59 1 15 Left Right Coupler 1 16 Expansion Foot FJ HK 69 4 17 Connection Board FJ HK 119 4 18 Caster Wheel 4 ...

Page 10: ... 1 21 Bent Bar FJ HK 61 3 22 Carton Bearer FJ HK 62 1 23 Frame FJ HK 05 1 24 Clamping Bar FJ HK 19 2 25 Clamping Pack Component 1 26 Support Base I FJ HK 28 2 27 Filter Roller FJ HK 23 2 28 Roller Shaft FJ HK 24 2 29 Connection Board I FJ HK 64 2 30 U Type Frame FJ HK 36 1 31 Cleat FJ HK 06 2 32 Bulkhead FJ HK 21 4 ...

Page 11: ...Cover FJ HK 58 3 Handle FJ HK 50 4 Stay Rod Pin FJ HK 49 5 Setting Bolt Spring FJ HK 48 6 Setting Bolt Spring Block FJ HK 51 7 Cylinder SC40x550 8 Cylinder Mounting Rack FJ HK 52 9 Location Bar FJ HK 53 10 Cylinder Pushing Frame FJ HK 54 11 Pushing Plate FJ HK 57 12 Location Clamping Chip FJ HK 55 13 Carrier Ring FJ HK 56 ...

Page 12: ... 17 2 2 Joint Bearing S110T K1 25 2 3 Spacer Bushing 2 4 Pendulum Mass FJ HK 31 2 5 Tail End Shift FJ HK 09 2 6 Cylinder MAL32x125 CA 2 7 Locating Bushing FJ HK 34 2 8 Drive Rag Wheel FJ HK 32 2 9 Copper Sheathing FJ HK 33 4 10 Main Fulcrum Shaft FJ HK 35 2 11 Chain 06B 1 12 Joint Buckle FJ HK 42 1 13 Tension Bar FJ HK 43 2 14 Chain Link Block FJ HK44 1 ...

Page 13: ...t Number Qty 1 Front Oscillating Arm FJ HK 18 2 2 Cylinder Limit Lock FJ HK 11 1 3 Joint Bearing S110 KM1 25 1 4 Cylinder Range Spacer FJ HK 10 1 5 Cylinder MAL25x125M1 25 1 6 Pin Roll FJ HK 13 1 7 Cylinder Rear Shaft FJ HK 25 1 8 Tail Stock FJ HK 12 1 9 Front Oscillating Arm Fulcrum FJ HK 22 1 ...

Page 14: ...carton MAL32X125 CA cylinder for folding carton MAL32X125 CA cylinder for pushing carton SC40X550 pressure filter AFR2000 M manual valve S3PM 06 R manual valve S3PM 06 G air operated valve air operated valve 4A220 08 change valve VZ 3 PK 3 底图总号 签 字 日 期 第 张 批 准 校 对 比 例 数 量 日 期 签 字 标准化 更改文件号 设 计 标记 处数 日 期 工 艺 审 核 图 样 标 记 共 张 inlet ...

Reviews: