ASSEMBLY INSTRUCTIONS
Double Gowning Rack
Eagle Foodservice Equipment, Eagle MHC, SpecFAB, and Retail Display are divisions of Eagle Group. ©2008 by the Eagle Group
• 100 Industrial Boulevard, Clayton, Delaware 19938-8903 U.S.A. • www.eaglegrp.com
• Phone: 302/653-3000 • (Foodservice) 800/441-8440 • (MHC/Retail) 800/637-5100
• Fax: 302/653-2065
figure 5.1
Step 5 - Install hangers.
Insert hangers into each hanger rail as shown in
figure 5.1 and figure 5.2.
Optional outer hanger rail cover
Slide optional outer hanger rail cover over each hanger rail, and install using #1 screws and #5 acorn nuts.
Tighten #3 bolts.
If removable-hanger gowning rack was ordered, fill remaining holes on each hanger rail with #6 plugs,
then tighten #3 bolts (mentioned in
Step 3
) to complete assembly. Otherwise, refer to instructions below.
post
assembly
hanger rail
#3 bolt
side of hanger rail
with louver
side of hanger rail
with hole
hanger
hanger
rail
Step 3 - Attach hanger rails.
On each side, attach hanger rail using #3 bolts. Do not tighten
bolts yet. Repeat on remaining side.
Step 4 - Attach top horizontal support bar.
Repeating
Step 2
, mount top bar and dust cover assemblies.
#5 acorn nut
#3 bolt
#1
screw
outer
hanger rail
cover
inner
hanger rail
figure 5.2
top horizontal
support bar
(End)