- 11 -
2.3 Installation
Step 1
- Place the machine in the desired location using a tow motor or crane capable of handling a
load of 3,000lbs.
(See Fig. 2-3)
Fig. 2-3
Step 2
- Remove the lower rear inspection panel on the mast prior to raising the mast. The panel is
located on the end of the machine next to the turntable motor
.
The panel has a warning label affixed
to it.
(See Fig. 2-4a & Fig. 2-4b)
Fig. 2-4a
Fig. 2-4b
Step 3
- Lift the mast using hoisting tools. A tow motor or hoist rated for at least 3,000lbs is required.
While lifting the mast, use caution to ensure that wires and connectors are not pinched.
(See Fig. 2-5a)
Once the machine is fully upright, one individual can stabilize the mast while a second individual
fastens the four M10 bolts to secure the mast to the base. The M10 bolts are to be tightened to
30ft/lbs of torque.
(See Fig. 2-5b)
Fig. 2-5a
Fig. 2-5b
Summary of Contents for 2000 B
Page 35: ... 35 6 1 Illustration Base ...
Page 38: ... 38 6 3 Illustration Mast ...
Page 40: ... 40 6 4 Illustration Carriage ...
Page 44: ... 44 6 6 Motor Controls ...
Page 45: ... 45 6 6 PLC Wiring ...
Page 46: ... 46 6 6 Optional Scale ...
Page 47: ... 47 6 6 Switches Relays ...