background image

2

SET UP THE GREENHOUSE

Step 1

Step 2

Step 3

Step 4

Step 5

Step 6

● 

● 

Assemble the metal frame as shown in the below diagram .
All the connectors are marked with letters that correspond to the letters in the
assembly instructions.
NOTICE: Please make sure all the tubes are fitted together snugly with no gaps.

Place the net racks on the shelves, and make sure they fit into place properly.

E

2

1

4

4 4

B

E

3

E

1

4

4 4

E

B

2

5

G

5

5

5

G

2

6

6

1

1

2

2

3

3

2

2

1

1

4

4

4

4

4

4

4

4

A

A

A

A

B

B

B

B

1

B

B

2 B

B

2 B

B

B

4 4

4

4

A

1

1

1

B

B

1

2

2 B

B

1

A

B

1

1

B

B

4 4

4 4

Part list

QTY

Part list

QTY

Part NO.

Part NO.

1

2
3
4
5
6

A
B
E
G
H

I

J

14
15

3

22

4
4

6

20

4
2
4

1

4

Reviews: