1-4 CONTROL DESCRIPTION: The following is a description of the controls on the control panel (see
figure 1-2 on page 2.
VOLT METER - A 150 volt meter used to measure the line to neutral voltage on the power
cable. A, B, or C phase can be selected using the meter selector switch. The meter should
read approximately 120 volts. A 150 volt or higher reading would indicate a line and neutral
cable switched on the power unit or cable.
AMMETER - A 200 amp ammeter used to measure the load being used by the load bank. It monitors
“A” phase.
FREQUENCY METER - A 55-65 HZ meter used to measure the frequency of the power unit. It should
read approximately 60HZ.
METER SWITCH - Switch used to select A, B, or C phase on the voltmeter.
RATE SWITCHES - Switch used to select the desired rate on the load bank. The rates are as follows:
1. 5 KW balanced load
2. 10 KW balanced load
3. 20 KW balanced load
4. 30 KW balanced load
5. 1-5 KW balanced load with rotary rate switch
POWER INDICATOR LIGHTS - These lights will light to indicate power on A, B, and C phase. All three
lights should be on.
METER TEST JACKS - This provides a place to connect an external meter. There is a test jack for
each cable pin.
POWER RECEPTACLE - The power cable from the equipment to be tested is plugged into the load
bank through the receptacle.
Summary of Contents for LB-400-100D
Page 5: ...Eagle Eye Power Solutions LLC...
Page 11: ...Eagle Eye Power Solutions LLC...
Page 13: ...Eagle Eye Power Solutions LLC...
Page 15: ...Eagle Eye Power Solutions LLC...
Page 19: ...Eagle Eye Power Solutions LLC...
Page 20: ...Eagle Eye Power Solutions LLC...
Page 21: ...Eagle Eye Power Solutions LLC...