background image

15

Expansion bolt installation diagram 

2. The luminance shall not be lower than 1001X indoors. 
3. Ensure installation position and dimension:

Two post floor plate lift 4T installation position diagram

PANZITTA SALES & SERVICE 

72 George Avenue 

Wilkes-Barre, PA 18705 

570-822-6720    800-822-6720 

www.panzittasales.com 

Summary of Contents for MTP-9F

Page 1: ...TWO POST SYMMETRIC LIFT FLOOR PLATE INSTALLATION OPERATION MANUAL READ THIS MANUAL BEFORE INSTALLING OR OPERATING THE LIFT PANZITTA SALES SERVICE 72 George Avenue Wilkes Barre PA 18705 570 822 6720 80...

Page 2: ...used by accidental abuse equipment misuse arbitrary change or repair for equipment or inconformity with operation and maintenance requirements for lifter of the company by user or the third party The...

Page 3: ...in operation The routine inspection for lifer shall not be conducted when the lifer is in failure or there is damage to parts and the original equipment parts shall be used when the part is repaired...

Page 4: ...ove safety device of the machine or makes it useless The hydraulic oil for the machine is N32 or N46 wear resistance hydraulic oil Please make sure to use it in safety scope and refer to appendix for...

Page 5: ...of lifter 2 Provide proper maintenance and inspection for 4 Forbid operating damaged lifter safety operation 5 The lifer shall be only used by operator trained 6 Only authorized person can conduct ope...

Page 6: ...ocated by tonnage in manual 12 There shall not be obstruction around lifter in hoist or falling 13 Prevent vehicle from excessive swing in hoist 14 Never make lifter in auto closing or controller beyo...

Page 7: ...ructure and Working Principle 12 Chapter V Equipment Installation and Commissioning 13 Chapter VI Safety Mechanism 22 Chapter VII Hydraulic System 24 Chapter VIII Operating Instructions 25 Chapter IX...

Page 8: ...es 1 3 Functions overview and features As the essence by our company integrating different domestic and overseas categories and models double column hydraulic lifter of series is based upon lots of da...

Page 9: ...16Mpa Note 1 Voltage The motor with different voltages can be selected in accordance with client s requirements Single phase three phase 110V 380V 60Hz Single phase three phase 220V 380V 50Hz standar...

Page 10: ...f Machine 3 1 Two post floor plate lift3 5T 4T Maximum passing width 2576 PANZITTA SALES SERVICE 72 George Avenue Wilkes Barre PA 18705 570 822 6720 800 822 6720 www panzittasales com 00 II C 317 2 28...

Page 11: ...11 3 2 Two post clear floor lift 4 0T outside connect PANZITTA SALES SERVICE 72 George Avenue Wilkes Barre PA 18705 570 822 6720 800 822 6720 www panzittasales com 3246 3114 2800 3426 Min 2570...

Page 12: ...plate lift 4 5 Description for different parts of common small scale gantry lifter S N Name 1 Common double column 2 Hydraulic pump station 3 Common slid 4 Curved arm 5 Medium extended arm 6 Mechanica...

Page 13: ...there is damage in transportation or loading unloading and whether accessories are complete before machine installation Then the installation and commissioning shall be conducted in procedures as foll...

Page 14: ...n figure Tighten nut with wrench Hit top core screw with hammer Clean dust in hole completely with dust remover or blowing pump PANZITTA SALES SERVICE 72 George Avenue Wilkes Barre PA 18705 570 822 67...

Page 15: ...not be lower than 1001X indoors 3 Ensure installation position and dimension Two post floor plate lift 4T installation position diagram PANZITTA SALES SERVICE 72 George Avenue Wilkes Barre PA 18705 57...

Page 16: ...l scale gantry lifter installation position diagram PANZITTA SALES SERVICE 72 George Avenue Wilkes Barre PA 18705 570 822 6720 800 822 6720 www panzittasales com 2693 v __J 1 1 1 I I I I Max 3445 3605...

Page 17: ...pe at bottom of main column after it inserts steel wire rope at the top fix it at screw hole in square hole of slide with two M16 nuts hoist auxiliary column and fixed it on slide of main column with...

Page 18: ...ing plate Upper rope wheel Steel wire rope 2 Slide Steel wire rope 2 Steel wire rope 2 Lower rope wheel Baseboard Steel wire rope 1 Lower rope wheel Baseboard Steel Steel wire rope 1 Upper Slide Upper...

Page 19: ...ylinder Pump station oil pipe RISING button Manual unloading valve Pump station connector Double column oil pipe connector Common straight connector 135 connector Backplate oil pipe 135 connector Comm...

Page 20: ...ecessed pan head screws there is plug ins in electric cabinet outlet and it is control line for electromagnet limit switch and return oil solenoid valve they are through 22 hole from the above pass oi...

Page 21: ...and time relay shall be on After 2 seconds the mechanical lock and oil return solenoid valve shall be opened Under the weight of working platform and lifting vehicle the hydraulic oil in lower cavity...

Page 22: ...imes loading is performed 13 After load commissioning the length of steel wire rope will be slightly extended Thus the leveling shall be carried out once again The machine can be put into use after st...

Page 23: ...rope for two slides can be undrawn Finally the manual unloading valve shall be pressed down and the lifter will descend Note 1 it is not allowed to install safety mechanism of electric lifter by perso...

Page 24: ...onnection 3 Oil inlet 4 Fuel tank 5 Oil filling pipe 6 Oil inlet 7 Oil filter 8 Valve body 9 Throttle valve for oil return 10 Oil drain valve Electronic oil drain valve 11 One way valve 12 Drain plug...

Page 25: ...e the bearing point to support the bearing surface of car The inspection on whether there is barrier shall be carried out Persons shall not approach it or lift with overweight Press down RISING button...

Page 26: ...for a long period of time Upon replacing hydraulic oil old oil in oil tank shall be released Upon filling new oil such oil shall be filtered with oil filter For each shift the inspection on whether th...

Page 27: ...QVSHFWLRQ RQ ZKHWKHU WKH connection between hydraulic cylinder and slides is normal or whether connection between chain and slides is loosen or dropped shall be performed 7KH LQVSHFWLRQ RQ ZKHWKHU ZL...

Page 28: ...OO EH LQVSHFWHG DQG DGMXVWHG to guarantee the horizontal rising and falling 9HUWLFDOLW RI YHUWLFDO FROXPQV VKDOO EH LQVSHFWHG Note lubricating oil shall be applied to interior angle for each vertical...

Page 29: ...ory Outside screen of oil filter is seriously jammed 1 Change phase sequence of motors 2 Supplement and discard hydraulic oil 3 Remove one way valve and the inching rises attention shall be paid to oi...

Page 30: ...e manual brake of vehicle must take effect in hoist and the hoist can be conducted when locking arm device is in normal status 6 The maintenance operation can be conducted when it is ensured that both...

Page 31: ...antee based upon invoice and guarantee or direct contact after sales service of our company The company will provide free maintenance or replacement for damaged parts in guarantee scope IV Any situati...

Page 32: ...thin one month since the purchase date and the return receipt shall be mailed to our company the guarantee card is never supplied for loss and it is invalid for arbitrary change Product model Product...

Page 33: ...are not limited to cables hoses slider blocks chains and rubber pads 3 On site labor Eagle Equipment reserves the right to make improvements and or design changes to its equipment without any obligati...

Reviews: