INSTALLATION INSTRUCTIONS
4.1 Preparations before installation
4.1.1 Space requirements.
Refer to 3.3 for the dimensions of the lift. There must also be a clearance of at least 0.6 meter between the lifting platform and fixed
elements (e.g. wall) in all lifting positions. There must be sufficient space at the ends of the lifting platform for driving vehicles on and off.
To stop vehicles colliding with the ceiling, it is advisable to fit an overhead light barrier in low ceiling buildings.
4.1.2 Foundations and connections
The user must have the following work performed before erecting the lift.
Construction of the foundation following consultation with the manufacturer’s customer service or an authorized service agent.
Routing of the wiring to the installation location.
The user must provide fuse protection for the connection.
Electrical system
connection must be done by licensed technicians.
Requirements for power supply cable of the installation site: at least 2.5mm
2
wire
core for 3Ph power and 4.0mm
2
wire core for 1Ph power.
Refer also to the corresponding information in the operation instructions.
Summary of Contents for EE-6435V2.S
Page 31: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 31...
Page 32: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 32...
Page 33: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 33...
Page 38: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 38...
Page 45: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 45...
Page 48: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 48...
Page 51: ......