
Installation, Operation and Parts Manual
EE-6435V2.B.PD
17
4.1.4
Tools
and
equipment
needed
for
installation
Tool
name
Specification
Quantity
needed
Electrical
drill
With
D16
and
D18
drill
bit.
1
Open
spanner
D17
‐
19mm
2
Adjustable
spanner
bigger
than
D30mm
1
Cross
socket
screw
driver
PH2
1
Quick
spanner
handle
adapter/
Ratchet
1
Socket
spanner
D24mm
1
Levelling
device
1
Hammer
10
pounds
1
Truck
lift
Capacity
more
than
2500KG
1
4.1.5
Checking
parts
Unfold
the
package
and
check
if
any
parts
missed
as
per
the
following
list.
Do
not
hesitate
to
contact
us
in
case
any
parts
missed,
but
if
you
do
not
contact
us
and
insist
installing
upon
the
lack
of
some
parts,
we
as
well
as
our
dealers
will
not
bear
any
responsibility
for
this
and
will
charge
for
any
parts
subsequently
demanded
by
the
buyer.
S/N
Name
Qty
1
Power
side
post
1
2
Secondary
post
3
3
Main
crossbeam
1
4
Secondary
crossbeam
1
5
Platform
A
1
6
Platform
B
1
7
Front
wheel
retainer
2
8
Post
cap
4
9
Protective
cover
4
10
Slider
holder
8
11
Plastic
chain
1
12
Wire
terminal
box
2
14
Rubber
pad
4
15
Hex
socket
flat
head
screw
M12*80
8
16
Hex
socket
button
head
screw
M8*20
8
17
Hex
head
full
swivel
screw
M12*30
4
18
Hex
head
full
swivel
screw
M10*35
4
19
Spring
washer
Ф
10
4
20
Hex
nut
M10
4
21
Flat
washer
Ф
10
4
22
Anti
‐
vibration
pad
4
23
Flat
washer
Ф
8
20
Summary of Contents for EE-6435V2.B.PD
Page 30: ...Installation Operation and Parts Manual EE 6435V2 B PD 30 Annex 1 Steel cable connection...
Page 36: ...Installation Operation and Parts Manual EE 6435V2 B PD 36...
Page 37: ...Installation Operation and Parts Manual EE 6435V2 B PD 37...
Page 38: ...Installation Operation and Parts Manual EE 6435V2 B PD 38...
Page 39: ...Installation Operation and Parts Manual EE 6435V2 B PD 39...
Page 40: ...Installation Operation and Parts Manual EE 6435V2 B PD 40...
Page 41: ...Installation Operation and Parts Manual EE 6435V2 B PD 41...