Installation, Operation and Parts Manual
EE-6215EKZ
14
Step
6:
Erect
and
secure
the
post.
1.
Use
suitable
means
to
raise
the
lifting
carriage
to
the
first
latching
position.
All
the
mounting
holes
in
the
base
plate
are
then
accessible.
Make
sure
the
locking
pawl
is
engaged.
2.
Check
the
position
of
the
base
plates
again.
3.
Drill
the
mounting
holes.
Remove
the
drilling
dust
from
the
hole.
4.
Use
a
spirit
level
to
check
the
vertical
alignment
of
the
lifting
posts.
If
necessary,
place
equalizing
plates
under
the
base
plates.
The
equalizing
plates
must
be
of
the
same
length
as
the
side
of
the
base
plate
resting
on
them.
Otherwise
the
load
of
the
base
plate
will
not
be
transferred
evenly
to
the
foundation.
5.
Erect
and
secure
the
other
post
similarly.
Step
7:
Connect
the
synchronization
steel
ropes.
1.
Route
and
fix
according
to
the
following
diagram
of
steel
cable
connection.
2.
Raise
both
carriages
to
the
first
latching
position
(approximately
800mm
above
the
ground).
3.
Make
sure
that
the
mechanical
safety
locks
in
each
post
are
fully
engaged
before
attempting
to
route
cables.
4.
After
the
cable
being
fixed,
adjust
and
make
the
cable
at
both
sides
be
with
the
same
tightness
which
could
be
judged
by
the
sound
emitted
during
lifting
process.
5.
Grease
after
being
fixed.
(It
is
a
must.)