E2S E2xS1R Instruction Manual Download Page 10

 

 

 

E2S Telephone: +44 (0)20 8743 8880 Fax: +44 (0)20 8740 4200 Email: [email protected] 

www.e2s.com 

DC-103_Issue_A - Page 2 of 2 - QAF_252_Issue_5

 

 

 

 

Martin Streetz 

Document No.: 

DC‐103_Issue_A 

Quality Assurance Manager 

Date and Place of Issue:  London, 22/08/2022 

UKCA Declaration of Conformity 

 

 

On behalf of European Safety Systems Ltd., I declare that, on the date the equipment accompanied by this declaration is placed on the market, the equipment 
conforms with all technical and regulatory requirements of the above listed directives, regulations and  standards. 

 

This Declaration is issued under the sole responsibility of the manufacturer. 

 

 

 

 

 

 

 

Summary of Contents for E2xS1R

Page 1: ...ON HUMIDE HAUT TENSION RISK DE CHOC ATTENDEZ 5 MINUTES APRES AVOIR DEBRANCHE L ALIMENTATION AVANT D OUVRIR LA BOITIER 3 Rating Marking Information 3 1 ATEX IECEx UKEx certification The E2xS1 alarm hor...

Page 2: ...l Electric Code CEC Class Zone ratings Canada Standards CAN CSA C22 2 No 60079 0 Ed 4 02 2019 Explosive Atmospheres Part 0 Equipment General Requirements CAN CSA C22 2 No 60079 7 Ed 2 Explosive Atmosp...

Page 3: ...d certified cable entry and or blanking devices during installation Equipment with the flare horn shall not be installed with the flare higher than horizontal to avoid accumulation of dust The equipme...

Page 4: ...nclosure See section 5 of this manual for access to the enclosure Wires having a cross sectional area between 0 5 mm to 2 5mm can be connected to each terminal way If an input and output wire is requi...

Page 5: ...1 0 0 1 544Hz 100mS 440Hz 400mS NF S 32 001 40 Tone 17 Tone 23 0 1 1 0 0 1 800Hz 0 25 sec on 1 sec off Intermittent 39 Tone 45 Tone 34 1 0 1 0 0 1 2000Hz Continuous 38 Tone 45 Tone 9 0 0 1 0 0 1 1000...

Page 6: ...IN MM DRAWING NUMBER A B C D E F G 10 9 G F E 7 8 6 5 D C 1 3 4 2 A B D209 06 001 R S RAIT R N POTTS R N POTTS 05 08 2020 OF E2xS1R E2xS1F E2xS2F SOUNDER WIRING DIAGRAMS INTRODUCTION RSR 05 08 2020 NT...

Page 7: ...Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 3G Ex ec IIC T4 T3 T2 Gc II 3D Ex tc IIIC 85 C 120 C Dc IP6X Dust Protection to EN60079 0 EN60079 31 Standar...

Page 8: ...e and Place of Issue London 22 08 2022 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the m...

Page 9: ...on Module D CSAE 22UKQAN0046 Provisions fulfilled by the equipment II 3G Ex ec IIC T4 T3 T2 Gc II 3D Ex tc IIIC 85 C 120 C Dc IP6X Dust Protection to EN60079 0 EN60079 31 Standards applied EN IEC 6007...

Page 10: ...Place of Issue London 22 08 2022 UKCA Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the marke...

Reviews: