background image

warning signals

2S

EUROPEAN SAFETY SYSTEMS LTD

IMPRESS HOUSE

MANSELL ROAD

ACTON

LONDON W3 7QH

WWW.E2S.COM

C

THIS DRAWING AND ANY INFORMATION OR DESCRIPTIVE 

MATTER THEREIN IS COMMUNICATED IN CONFIDENCE AND 

IS THE COPYRIGHT PROPERTY OF EUROPEAN SAFETY 

SYSTEMS LTD. NEITHER THE WHOLE OR ANY EXTRACT MAY 

BE DISCLOSED, LOANED, COPIED OR USED FOR 

MANUFACTURING OR TENDERING PURPOSES WITHOUT THEIR 

WRITTEN CONSENT.

EUROPEAN SAFETY SYSTEMS LTD.

AS PER LATEST DATE OF ISSUE SHOWN ABOVE

DRAWING TO BS8888:2000

GEOMETRIC TOLERANCES TO ISO1101:1983

LINEAR DIMENSIONAL TOLS

ANGULAR DIMENSIONAL TOLS

STANDARDS

MOD No.

REASON - INITIAL - DATE

ISSUE

DATE

APPROVED

CHECKED

DATE

DATE

DRAWN

WEIGHT (Kg)

SURFACE FINISH

MATERIAL

ALTERNATIVE MATERIAL

SHEET

SCALE

TITLE

A3

IF IN DOUBT, ASK - 

DO NOT SCALE

ALL DIMENSIONS IN MM

DRAWING NUMBER

A

B

C

D

E

F

G

10

9

G

F

E

7

8

6

5

D

C

1

3

4

2

A

B

D190-06-001

R.S.RAIT

B.ISARD

R.N.POTTS

NTS

SWITCHES FOR STAGE OPERATION

CUSTOMER SUPPLIED

Stage 2 -ve

ve IN

ve OUT

Stage 1 -ve OUT

Stage 3 -ve

Stage 1 -ve IN

H2

H1

Stage 1 +ve

Stage 1 -ve

Stage 2 -ve

Stage 2 +ve

OF

2

3

R1

+

-

-

+

S2

S3

R1

+

-

-

+

S2

R2

OPTIONAL LINE MONITORING RESISTOR, CUSTOMER SUPPLIED,  

14V MAX SYSTEM = 120Ω MIN, 2W MIN OR 1KΩ MIN, 0.5W MIN

28V MAX SYSTEM = 470Ω MIN, 2W MIN OR 2.4KΩ MIN, 0.5W MIN

RECOMMENDED MINIMUM VALUES:

R1

Set H1 & H2 to -ve switching

Three/Four Stages. Voltage Free 2nd, 3rd & 4th Stage Activation Configuration

Config.: 2

Common Positive

Customer Set H1 & H2 to Negative Switching (See Below)

Stage 1: Apply Power to ve & Stage 1 -ve 

Stage 2: Apply Power to ve & Stage 1 -ve & connect Stage 2 -ve to Stage 1 -ve 

Stage 3: Apply Power to ve & Stage 1 -ve & connect Stage 3 -ve to Stage 1 -ve 

Stage 4: Apply Power to ve & Stage 1 -ve

& connect Stage 2 -ve & Stage 3 -ve to Stage 1 -ve

Two Stage Configuration 

        Config.: 3

Independent Stage Input

Reverse Polarity Stage Monitoring

Stage 1: Apply Power to Stage 1 +ve & Stage 1 -ve

Stage 2: Apply Power to Stage 1 +ve & Stage 1 -ve & connect Stage 2 -ve to Stage 1 -ve

H2

H1

Set H1 & H2 to -ve switching

Cut Link W1

INTRODUCTIONINTRODUCTION

1

RSR - 19/01/2022

19/01/2022

19/01/2022

19/01/2022

D1x

D1xS1 / D1xS2 / GNExS1 / GNExS2 / STExS1 / 

STExS2 DC SOUNDER WIRING DIAGRAMS

Summary of Contents for D1xS2FDC024-A

Page 1: ...ATMOSPHERES DISCONNECT FROM SUPPLY BEFORE OPENING KEEP TIGHTLY CLOSED WHEN IN OPERATION WARNING FIT SEALING FITTING IN CONDUIT RUNS WITHIN 18 INCHES FROM ENCLOSURE EQUIPMENT MUST NOT BE INSTALLED WITH THE HORN FACING UPWARDS OF HORIZONTAL DO NOT OPEN WHEN AN EXPLOSIVE ATMOSPHERE IS PRESENT DO NOT OPEN WHEN ENERGISED POTENTIAL ELECTROSTATIC CHARGING HAZARD CLEAN ONLY WITH A DAMP CLOTH ENCLOSURE ENT...

Page 2: ...0 C Ex tb IIIC T95 C Db Ta 55 C to 75 C D1xS2 AC230 A Ex db IIC T5 Gb Ta 55 C to 75 C Ex db IIC T6 Gb Ta 55 C to 60 C Ex tb IIIC T93 C Db Ta 55 C to 75 C See Product table for electrical ratings of each unit model Certificate No DEMKO 19ATEX2141X IECEx ULD 19 0008X UKEx UL UL21UKEX2132X Epsilon x Equipment Group and Category II 2G II 2D CE Marking and Notified Body No 2813 UKCA Marking and Notifie...

Page 3: ...harges on non conducting surfaces Only the explosionproof cover is to be used for access to the enclosure for installation service and maintenance 6 Specific Conditions for Safe Use Flameproof threaded joints and cemented joints are not permitted to be repaired 7 Product Mounting and Access 7 1 Mounting The D1x Alarm Horn may be secured to any flat surface using at least two of the three or four 7...

Page 4: ...and the length of the cable runs The cable size selected must have the necessary capacity to provide the input current to all the sounders connected to the line AC 1 0 2 5mm2 AWG18 AWG12 DC 0 2 2 5mm2 AWG24 AWG12 Fig 3 Wire Preparation When connecting wires to the terminals great care should be taken to dress the wires so that when the cover is inserted into the chamber the wires do not exert exce...

Page 5: ...nders See schematic diagram D190 06 001 for details 9 1 Configuration See Table 1 for product power supply and Sound Pressure Levels SPL Configuration for DC Units Fig 5 DC PCBA Configuration for AC Units Fig 6 AC PCBA 9 2 Stage Switching Polarity DC Units Switching from positive switching default to negative switching DC Only NOTE Max supply is 33V DC if higher DC voltage is required use Negative...

Page 6: ...wiring options Config Voltage Configuration Description Features Product Option Identifier 1a DC Single Stage Configuration Line monitoring Positive Switching 1 1b DC Two Stage Configuration Common Negative Positive Switching 1 1c DC Three Four Stage Configuration Common Negative Positive Switching 1 2 DC Three Four Stages Voltage Free 2nd 3rd 4th Stage Activation Configuration Common Positive Cus...

Page 7: ...Of Line Monitoring An optional 12 way terminal module is available to enable up to four alarm stages to be activated from three DC voltage output channels The three alarm stage activation inputs can be independently monitored Refer to Schematic D190 06 001 Config 6 Specify Product option V when ordering Spare part code for field installation SP78 0001 11 Maintenance Overhaul and Repair Maintenance...

Page 8: ...ices may be fitted between the ve ve terminals of the PCBA Please ensure that the device legs meet the wire size range stated for the connection terminals and are fitted correctly in order to avoid a short Refer to the compatible control panel specification for EOL device values and ratings Model Nominal Voltage Voltage Range P1 Nominal Operating Current P2 Nominal Operating Current P3 Nominal Ope...

Page 9: ... 0 0 0 1 0 1 0 0 0 0 1 1 0 0 0 1 1 1 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 0 1 0 1 0 0 1 1 0 1 0 0 0 0 1 1 0 0 1 0 1 1 0 0 0 1 1 1 0 0 1 1 1 1 0 0 0 0 0 0 1 0 1 0 0 0 1 0 0 1 0 0 1 0 1 1 0 0 1 0 0 0 1 0 1 0 1 0 1 0 1 0 0 1 1 0 1 0 1 1 1 0 1 0 1 1 0 1 1 0 0 0 1 1 1 0 0 1 1 1 1 0 0 0 0 0 0 1 0 1 0 0 0 1 1 1 0 0 0 1 0 0 1 0 0 1 1 0 1 0 0 1 0 1 1 0 0 1 1 1 1 0 0 1 0 0 0 1 0 1 0 1 0 1 0 1 1 0 1 1 0 1 0 1 1 1 0...

Page 10: ...100 2dB A CA 108 5dB A P3 US 103 5dB A CA 111 6dB A at 10 feet 24Vdc For Fire Alarm applications the Sounder Volume must be at the highest setting see volume control section For fire alarm use Tone 12 as shown below must be selected Connection Terminals Pluggable AC 1 0 2 5mm2 AWG18 AWG12 DC 0 2 2 5mm2 AWG24 AWG12 Terminal Tightening torque 0 4Nm To maintain Ingress Protection cable entries must b...

Page 11: ...cal Axis 3dB A 39 41 38 41 6dB A 45 47 64 69 D1xS2FDC024 A D1xS2FDC024 S Sounder Directional Characteristics for Canadian Fire CAN ULC S525 P3 OSPL Horizontal Axis Vertical Axis 3dB A 46 48 46 47 6dB A 52 54 52 53 D1xS1RDC024 A D1xS1RDC024 S Sounder Directional Characteristics for Canadian Fire CAN ULC S525 OSPL Horizontal Axis Vertical Axis 3dB A 42 41 42 41 6dB A 48 48 48 49 D1xS2HDC024 A D1xS2H...

Page 12: ...NE MONITORING RESISTOR CUSTOMER SUPPLIED 14V MAX SYSTEM 120Ω MIN 2W MIN OR 1KΩ MIN 0 5W MIN 28V MAX SYSTEM 470Ω MIN 2W MIN OR 2 4KΩ MIN 0 5W MIN RECOMMENDED MINIMUM VALUES R1 Stage 1 ve IN Stage 1 ve OUT Common ve IN Common ve OUT Stage 2 ve Stage 1 ve IN Stage 1 ve OUT Common ve IN Common ve OUT Stage 2 ve Stage 3 ve R1 R1 S2 R1 S2 S3 Stage 1 ve IN Stage 1 ve OUT Stage 1 ve IN Stage 1 ve OUT Sing...

Page 13: ... ve OUT Stage 1 ve OUT Stage 3 ve Stage 1 ve IN H2 H1 Stage 1 ve Stage 1 ve Stage 2 ve Stage 2 ve OF 2 3 R1 S2 S3 R1 S2 R2 OPTIONAL LINE MONITORING RESISTOR CUSTOMER SUPPLIED 14V MAX SYSTEM 120Ω MIN 2W MIN OR 1KΩ MIN 0 5W MIN 28V MAX SYSTEM 470Ω MIN 2W MIN OR 2 4KΩ MIN 0 5W MIN RECOMMENDED MINIMUM VALUES R1 Set H1 H2 to ve switching Three Four Stages Voltage Free 2nd 3rd 4th Stage Activation Confi...

Page 14: ...r to Stage 2 ve Stage 2 ve Two Three Stage Voltage Free Activation Configuration Config 5 Customer Set H1 H2 to Negative Switching See Below Power ve ve Stage 1 Connect Stage 1 ve to Common ve Stage 2 Cconnect Stage 2 ve to Common ve Stage 3 Connect both Stage 1 ve Stage 2 ve to Common ve CUSTOM CONFIGURATION PRODUCT OPTION Y Cut Link W1 H2 H1 Set H1 H2 to ve switching CUSTOM CONFIGURATION PRODUCT...

Page 15: ...05 R S RAIT B ISARD R N POTTS OF NTS 1 SWITCHES FOR STAGE OPERATION CUSTOMER SUPPLIED 1 Earth Earth Stage 2 Stage 3 Common Live IN Live OUT Neutral IN Neutral OUT Earth Stage 1 Stage 2 Common N N L L E N N L L E C N N L L E C S2 S3 Live IN Live OUT Neutral IN Neutral OUT Stage 1 Live IN Stage 1 Live OUT Stage 1 Neutral IN Stage 1 Neutral OUT Single Stage Configuration Config 1a Stage 1 Apply Power...

Page 16: ...awarden Industrial Park Hawarden Deeside CH5 3US UK Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 2G Ex db IIC T6 T3 GB II 2D Ex tb IIIC T82 C 145 C Db Standards applied EN 60079 0 2018 EN 60079 1 2014 EN60079 31 2014 Directive 2014 30 EU Electromagnetic Compatibility Directive EMC Standards applied EN 61000 6 1 2007 EN 61000 6 2 2005 EN 61000 6...

Page 17: ...te and Place of Issue London 10 02 2022 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the market the equipment conforms with all technical and regulatory requirements of the above listed directives regulations and standards This Declaration is issued under the sole responsibility of the ma...

Page 18: ... CH4 9JN UK Quality Assurance Notification Module D CSAE 22UKQAN0046 Provisions fulfilled by the equipment II 2G Ex db IIC T6 T3 GB II 2D Ex tb IIIC T82 C 145 C Db Standards applied EN 60079 0 2018 EN 60079 1 2014 EN60079 31 2014 Directive 2014 30 EU Electromagnetic Compatibility Directive EMC Standards applied EN 61000 6 1 2007 EN 61000 6 2 2005 EN 61000 6 3 2007 A1 2011 AC 2012 EN 61000 6 4 2007...

Page 19: ...Date and Place of Issue London 24 02 2022 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the market the equipment conforms with all technical and regulatory requirements of the above listed directives regulations and standards This Declaration is issued under the sole responsibility of the ...

Page 20: ...Page left Intentionally blank ...

Reviews: