Pull Pin
1.
With partner, lift up two
adjacent outer legs, release
the toggle lock and telescope
inner legs into outer legs. Lift
remaining outer legs, release
the toggle lock telescoping
inner legs into outer legs.
6.
Lift two adjacent
outer legs and slide out the
inner legs until the toggle
engages the inner leg.
Lift remaining outer legs
and pull out inner legs until
the toggle engages the inner
leg.
Use spikes or weight
bags to secure in windy con-
ditions.
3.
With partner on oppo-
site sides grasp the top of
the diamond shaped area
over trusses by “close“ stick-
er. Lift the shelter up slightly
and shake it while stepping
towards your partner until the
shelter is 3/4 closed. Grasp
adjacent outer legs and push
shelter together until it fully
closes.
Be careful not to pinch
fingers.
Store shelter in roller
bag.
5.
Engage the Pull-Pin
Auto Slider
®
at each corner
by pushing up on slider with
one hand while pushing down
the top of the leg with the
other hand. The pull pin will
engage the hole. Repeat steps
on remaining legs.
1.
Place your E-Z UP
®
frame
in the center of area to be
shaded. With partner on oppo-
site side, grasp two outer legs,
slightly lift off ground and step
backwards, stopping at full
arms’ length.
*2.
Gently unfold the fabric
top and place it over the open
frame.
*3.
Attach the top to the
E-Z UP
®
frame by pulling the
valance down matching the hook
and loop strips on the top with the
strips on the frame. Pull the cor-
ners down fully. Push the strips
firmly together at each corner.
4.
Grasp the bottom of
the diamond-shaped area of
trusses on opposite sides by
the “open” sticker. Slightly
lift up shelter and push hands
together while stepping back-
wards until shelter is fully
opened.
Be careful not to
pinch fingers.
2.
Release pull pin slider
at each corner by first lift-
ing valance fabric away from
slider. With one hand, push
up on truss near slider to
remove the weight of the shel-
ter from the pull pin. Release
slide by disengaging pull
pin and push slider down.
*Note:
Once top is permanently attached, only perform
steps 1 and 4 - 6 to set up.
• 1 10’ x 10’ (3.0 m x 3.0 m) Frame
• 1 Hi-Viz Top
*
• 4 Piece Standard Spike Kit
• 1 Roller Bag
*
*
Available in the Shelter Package onl
y
Please read each step before you attempt to set up.
Save these instructions for future reference.
H
ow
t
o
S
et
U
p
*Note: First Time Attachment Is Required.
Top and frame are shipped unattached to avoid damage. The first time
you set up, the top must be attached to the frame with Hook and Loop
Strips. Once top is attached, set up and take down are easily accom-
plished within seconds.