E-TON MATRIX PN2H 50CC Installation Download Page 2

E-TON 2009 MATRIX SCOOTER 

LUGGAGE BOX INSTALLATION 



STEP 4—

The bolts should protrude from the bottom of 

the box and on either side of the middle two bars on 
the rack as shown in Picture 

A

 and the diagram. 

 
 
 
 
 

 



If the bolts are aligned properly on the outsides of the 
bars as shown, install the mounting brackets from  
underneath by sliding them widthwise across the bars 
onto the bolts with the hollow side facing down and  
affixing locking nuts onto the bolts.  Refer to Picture 

B

.  

Tighten the nuts with a wrench to hold the assembly in 
place.  

 

RACK 

BOLT 

CONNECTING THE LIGHTS 



STEP 5—

Remove the storage box underneath the seat by 

removing the six bolts shown in the picture to gain access to 
the rear tail light wire harness, which is located on the right-
hand side of the vehicle next to the fuel tank. 
 



STEP 6—

Thread the lamp wire through the hole in the cor-

ner at the base of the luggage box as shown in the picture. 
 



STEP 7—

Connect the 

BLACK/WHITE 

wire from the luggage box to the 

GREEN/YELLOW

 wire on the tail light wire harness. 



Connect the 

BLACK

 wire from the luggage box to the 

BLACK 

wire on 

the tail light wire harness.  Use the connector supplied with the kit.   
Ensure all connections are tight and use electrical tape or an electrical 
wire tie where necessary. 



Test operation by turning on the ignition and squeezing the brake lever.  
The brake lights on the box should illuminate.  If not, ensure the con-
nections are correct and properly secured.  Reinstall the storage box 
beneath the seat when wiring is complete.  The luggage box is now 
ready to be enjoyed. 

MALE END 

FEMALE END 

Reviews: