5.2.9 Construction
This program is used to define a construction site by combining set-up of the instrument
along with a construction line, measuring and stake out points relative to the line.
To set construction, do the following:
1. To enter
Program
menu page, press
MENU
and
F1
or
1
.
2. Press
PAGE
to go to the third page, and press
F1
or
9
:
o
: it indicates that settings are done.
o
: it indicates that settings are not done.
3. Do the following:
a.
If you have done it before, you can skip it.
b.
c.
d.
5.2.9.1 Set a Job
5.2.9.2 Set EDM
5.2.9.3 Set the New Construction Site
To set the new construction site, do the following:
1. To enter
CONTRUCTION-STAKE POINT
display, in
CONSTRUCTION STAKE
display, press
F3
/
3
.
2. To determine the start point, press
F1 ALL
. The display shows
Data Saved
.
Summary of Contents for E3L
Page 1: ...Shanghai eSurvey GNSS Co Ltd 1st Edition V1 1 E3L USER GUIDE TOTAL STATION...
Page 2: ......
Page 4: ...SHANGHAI ESURVEY GNSS CO LTD...
Page 10: ...SHANGHAI ESURVEY GNSS CO LTD VI...
Page 40: ...SHANGHAI ESURVEY GNSS CO LTD 30 Orthogonal Stake out The principle is as follows...
Page 115: ......