
LNK-INJ301
Hardened Gigabit High Power PoE Injector
2
V1.0
Installation
DIN Rail Installation
LNK-INJ301
can be installed on a DIN rail. Installation steps are as follows:
Wall Mount Installation
LNK-INJ301
also can be installed on a Wall Mount. Installation steps are as follows:
Setup
a) Connect the Ethernet port of the injector to a LAN switch with a network cable.
b) Connect the PoE Out port to the PoE device
c) After the device is powered on, the PWR indicator will all be on. If the indicators are not on, check the
power supply connection.
d) After all cables are correctly connected, the indicators will be lit as per port status LEDs (page 3)..
1. Tighten the screws to fix the
DIN Rail plate
1. Tighten the screws to fix the
Wall Mount plate
2. Mount the switch on the wall
or on a flat surface with 2 screws
piercing through the mounting
holes to secure it in position.
Upper part
2. Lock the upper part of the DIN
rail clip on the upper side of the
track. Gently press it until the clip
is securely locked on the track.
Press