2.1 Noise and vibration data
The following noise and vibration data were determined in accord-
ance with the following guidelines under equipment specific condi-
tions and by using harmonized standards:
n
EU Machine Directive edition 2006/42/EU
n
Noise Emission Directive 2000/14/EU, Noise Protection Direc-
tive 2003/10/EU
n
Vibration Protection Directive 2002/44/EU
During operation these values may vary because of the prevailing
operating conditions.
2.1.1 Noise data
L
pA
= 96 dB(A), determined acc. to ISO 11201 and EN 500.
WARNING!
Loss of hearing caused by too high noise bur-
dens!
–
Wear your personal protective equipment (ear
protection).
L
WA
= 108 dB(A), determined acc. to ISO 3744 and EN 500.
2.1.2 Vibration data
Vector total of the weighted effective acceleration in three orthog-
onal directions:
Total vibration value a
hv
= 7.9 m/s
2
on crushed rock determined
acc. to EN 500/ISO 5349.
Associated uncertainty K
= 1.9 m/s
2
, determined acc. to EN
12096.
Observe the daily vibration load (work safety acc. to 2002/44/EC).
Vector total of the weighted effective acceleration in three orthog-
onal directions:
Total vibration value a
hv
£
2.5 m/s
2
on crushed rock determined
acc. to ISO 5349 and EN 500.
Associated uncertainty K
= 0.3 m/s
2
, determined acc. to EN
12096.
Observe the daily vibration load (work safety acc. to 2002/44/EC).
Sound pressure level at the opera-
tor's stand
Guaranteed sound power level
Hand-arm vibration
Hand-arm vibration with comfort
guide handle (optional equipment)
Technical data – Noise and vibration data
DFP9
14
Summary of Contents for DFP9
Page 2: ...2...
Page 6: ...Table of contents DFP9 6...
Page 7: ...1 Introduction Introduction DFP9 7...
Page 11: ...2 Technical data Technical data DFP9 11...
Page 15: ...3 Concerning your safety Concerning your safety DFP9 15...
Page 38: ...Concerning your safety Signage DFP9 38...
Page 39: ...4 Indicators and control elements Indicators and control elements DFP9 39...
Page 45: ...5 Checks prior to start up Checks prior to start up DFP9 45...
Page 52: ...Checks prior to start up Checking the water level topping up DFP9 52...
Page 53: ...6 Operation Operation DFP9 53...
Page 64: ...Operation Parking the machine in secured condition DFP9 64...
Page 65: ...7 Loading transporting the machine Loading transporting the machine DFP9 65...
Page 69: ...8 Maintenance Maintenance DFP9 69...
Page 100: ...Maintenance As required DFP9 100...
Page 101: ...9 Troubleshooting Troubleshooting DFP9 101...
Page 107: ...10 Disposal Disposal DFP9 107...
Page 109: ...11 List of special tools List of special tools DFP9 109...
Page 111: ......
Page 112: ......