SYSTEM MANUAL Version 6.03i
41
Screen 1: Distance
Screen 2: Chainage
Fig. 6.14 – Entering Chainage
NOTE:
We may freely switch between
CHAINAGE
and
DISTANCE
. When a distance is
entered, the chainage is automatically stored (it is displayed on the attenuation
display).
The
CHAINAGE START POINT
is used to start a new survey in the same way as a normal
START POINT
, except this Start Point does not have to be zero. As an example, consider
a survey of four points. The first point is at CP marker 10 which has a distance marker of
3,678ft and the last point is at CP marker 11 which has a distance marker of 4,578ft. The
two intermediate points are 300ft apart.
Point
CP number
Line distance
distance
chainage
#00 10 3678
3678
#01 -
-
300 3978
#02 -
-
300 4278
#03 11 4578 -
4578
Point #00 is entered as a chainage start point with a value of 3678ft
Points #01 and #02 are entered as
distance
from previous point as 300ft
Point #03 is entered as chainage 4578ft.
C-SCAN will calculate the Chainage of the two intermediate points, even though they were
entered as Distances.
NOTE:
The maximum number that can be entered for chainage is 99,999ft.
Select Distance button to enter
distance screen (screen 1 –
opposite)
Chainage Start Point
Start Point
Select Chainage button to enter
chainage screen (screen 2 –
opposite)