For Technical Support or Troubleshooting, Call: 1-877-447-4768 www.ghpgroupinc.com 3
The heater is designed for use as a construction heater in
accordance with ANSI Z83.7, CSA 2.14. Other standards
govern the use of fuel gases and heating products for
specific uses. Your local authority can advised you about
these. The primary purpose of construction heaters is to
provide temporary heating of building under construction,
alteration or repair. Properly used, the heater provides
safe economical heating. Products of combustion are
vented into the area being heated.
CLEARANCE TO COMBUSTIBLES:
LPC25 Series
LPC80 Series
LPC200 Series
The heater must be located at least 6 ft. (1.83 m) in the
U.S.; or (ii) 10 ft. (3 m) in Canada, from any propane gas
container.
Minimum
Minimum
Maximum Maximum
(lb/h)
0.7
(0.32 kg/h)
1.16
(0.53 kg/h)
2.32
(1.05 kg/h)
3.71
(1.68 kg/h)
2.32
(1.05 kg/h)
9.28
(4.21 kg/h)
11.7 x 12.87
(29.69 x 32.79 cm)
15.9 x 18.3
(40.41 x 46.99 cm)
15.9 x 26.2
(40.41 x 66.49 cm)
.196
(4.98 mm)
.196
(4.98 mm)
.196
(4.98 mm)
2 ft. (60 cm)
2 ft. (60 cm)
3 ft. (91 cm)
4 ft. (1.22 m)
5 ft. (1.52 m)
6 ft. (1.82 m)
(37.8 °C).
NEVER LEAVE THE HEATER UNATTENDED WHILE BURNING!
Summary of Contents for RMC-LPC200DG
Page 2: ......