
- 13 -
Secure the
DXE-PS-2B-P
to the tower between the two stacked antennas using the included
DXE-
SSVC-2P
V Saddle Clamp.
Use Anti-Seize or Never-Seez® on all stainless steel hardware to prevent galling.
Install the
DXE-PS-2B-P
with the connectors facing down.
The coaxial cable from the
upper
Yagi is connected to
ANT 2
.
The coaxial cable from the
lower
Yagi is connected to
ANT 1
.
The feedline from the
transmitter
is connected to
INPUT
.
Fasten all cables to the
tower to relieve strain, and
gently droop the cables to form a
drip loop (do not use tight bends with
coaxial cable).
Note:
Do not seal the green connector! The
connector is recessed inside a drip edge that prevents
water from getting into connector. The cover-to-
connector plate junction is not sealed so the unit can
"breathe” and eliminate condensation.
The following table designates the sequence of antenna ports selected when using the
EC-PS2
Switch Console.
EC-PS2
LED ON
Activated Antenna(s)
1 + 2
BOTH Yagi Antennas Activated, In Phase
1 +
BOTH Yagi Antennas Activated, Out of Phase
2
1
LOWER Yagi Antenna only
2
UPPER Yagi Antenna only