background image

- 3 - 

Parts List

 

 

Item # 

Figure 1 

Description 

Quantity 

12 M Add On Kit - Bottom Bracket 

12 M Add On Kit - Top Bracket 

12 M Add On Kit - Mounting Plate 

FLEX-

WEAVE™ Wire assembly, 14 ga. with soldered terminals 

1-1/4" Stainless Steel Studded Clamp  

# 10-24 Stainless Steel Hex nut 

# 10  Stainless Steel Split washer 

# 10  Stainless Steel Flat washer 

11 

# 10-24 x 1/2"  Stainless Steel Hex Head Bolt 

10 

# 10 x 1" Stainless Steel Fender washer 

11 

10-24 x 5/8" Stainless Steel Carriage Bolt 

12 

# 10  Stainless Steel External Star Washer 

13 

# 10-24 Stainless Steel Wing Nut 

14 

1/8" Diameter x 9"  Stainless Steel Hot Rodz™ 

15 

1/8" Black Vinyl Cap 

 

Scotch-Brite® Pad 

 
 

Figure 1 - Exploded Parts Drawing 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Summary of Contents for DXE-AOK-12M

Page 1: ...ding DXE AOK 12M INS Revision 1c DXE AOK 12M Installed on a BTV with optional Tilt Base and Direct Coax Feedpoint DX Engineering 2012 P O Box 1491 Akron OH 44309 1491 Phone 800 777 0703 Tech Support a...

Page 2: ...l band If your BTV is installed on the roof or in an elevated position four resonant radials for 12 meters should be added 9 ft 4 5 8 inches each Included Materials Pre assembled 14 ga stranded tin co...

Page 3: ...3 6 10 24 Stainless Steel Hex nut 7 7 10 Stainless Steel Split washer 8 8 10 Stainless Steel Flat washer 11 9 10 24 x 1 2 Stainless Steel Hex Head Bolt 2 10 10 x 1 Stainless Steel Fender washer 1 11...

Page 4: ...eel 1 Assemble one of the studded band clamps to the wide end of the bottom bracket using a star washer flat washer split washer and nut as shown below 2 Install the FLEX WEAVE Wire Assembly to the na...

Page 5: ...ich Hustler BTV model you have installation of the 12m kit is identical The kit upper mounting plate attaches directly to the vertical just below the 10m trap as shown using the stainless steel studde...

Page 6: ...r and nut as shown below Final positioning of the top and bottom brackets should be done so the FLEX WEAVE 12 meter wire is parallel to the Hustler BTV lower element The Top and Bottom Brackets are in...

Page 7: ...frequency Both Hot Rodz should be adjusted equally and should not need to be adjusted more than a couple of inches Make adjustments in small steps 1 2 in of adjustment should change the resonant frequ...

Page 8: ...ssue shipping instructions for return to DX Engineering transportation charges prepaid by Buyer Every such claim for breach of these warranties shall be deemed to be waived by Buyer unless made in wri...

Reviews: