
2
1.
Begin by opening all packaged items and inspecting them for damage or missing items. Contact the
company you purchased the item from if there are any concerns.
2.
Once all items are opened, remove the front rail for the Trail Rail Management System if applicable.
3.
Attached the header board loosely with the supplied hardware as shown in the image.