Models and Performance

4

Models and Performance

This section contains details on the different models in the Element UHP Cylinder range, with their relative specifications 
and performance.

2.1 General Technical Specification

This table shows specifications which apply to every model in the Element UHP range

Figure 1:

Identifying Models

Description

Value

Maximum Flow Rate

77 litres/minute

Inlet/outlet Connections

28mm

Immersion Heater Voltage

240V

Immersion Heater Power

3kW (6kW option available)

Insulation Thickness

60mm

Pressure Relief Valve Setting (4.5 bar models)

6 bar

Pressure Relief Valve Setting (6 bar models)

8 bar

E U H P C 3 0 0 6 0 V  -  S6  -  2C  -  FR

EUHPC = Product Prefix

Pressure Rating

45 = 4.5 bar
60 = 6.0 bar

Capacity

080 = 80 litres

150 = 150 litres
175 = 175 litres
215 = 215 litres
250 = 250 litres
300 = 300 litres
400 = 400 litres

Orientation

V = vertical

H = horizontal

500 = 500 litres

Immersion Heater

null = standard 3 kW

S6 = 6kW immersion heater

T3 = 2 × 3kW immersion heaters
T6 = 2 × 6kW immersion heaters

null = single coil 

2C = twin coil 

Twin Coil Units

Fast Recovery Coil

null = standard coil

 

FR = fast recovery coil

Summary of Contents for EUHPC08045V

Page 1: ...Ultra High Performance Indirect Hot Water Cylinders User Guide Document Reference DOC EUHPCOM1701...

Page 2: ...ion 3 2 Models and Performance 4 3 Product Specifications 5 4 Installation Instructions 6 5 Wiring Instructions 11 6 Tundish 14 7 Discharge Pipework 15 8 Commissioning 17 9 Maintenance 18 10 Fault Fin...

Page 3: ...erty There is no longer a requirement to have a tank in the roof system 1 2 The Benefits of Element by Dutypoint Unvented UHP Cylinders Operating pressures up to 6 0 bar dependent on model High flow r...

Page 4: ...e 240V Immersion Heater Power 3kW 6kW option available Insulation Thickness 60mm Pressure Relief Valve Setting 4 5 bar models 6 bar Pressure Relief Valve Setting 6 bar models 8 bar EUHPC30060V S6 2C F...

Page 5: ...4 5 35 576 1484 50 265 20 32 1 72 EUHPC21560V 215 6 35 576 1484 50 265 20 32 1 72 EUHPC25045V 250 4 5 35 576 1752 55 310 20 38 1 87 EUHPC25060V 250 6 50 576 1752 55 310 20 38 1 87 EUHPC30045V 300 4 5...

Page 6: ...he installer is legally required to complete a commissioning checklist as a means of complying with the appropriate Building Regulations England and Wales All installations must be notified to Local A...

Page 7: ...appliance requirements 4 10 Inlet Group The inlet group will vary depending on whether the vessel is fitted as internal or external expansion see Figure 1 Figure 2 Figure 3 4 11 Connecting the Water...

Page 8: ...d in the cold water inlet to facilitate draining of the cylinder see Figure 1 A swept tee is needed for all indirect models if secondary circulation is required and is fitted as per the illustration A...

Page 9: ...relief valve and the cylinder see figure 2 and should always be positioned with the entry point at the bottom Installation should always be by means of a standard T connector ensuring no other valve...

Page 10: ...Installation Instructions 10 Figure 4 Combination Inlet Valve Mains water connection Balanced cold water if required To expansion vessel Supply to cylinder Pressure relief valve connection...

Page 11: ...linder Range WARNING ALL ELECTRICAL WIRING SHOULD BE CARRIED OUT BY A COMPETENT ELECTRICAL CONTRACTOR AND MUST CONFORM TO THE LATEST IEE WIRING REGULATIONS Do not switch the power on until the unit ha...

Page 12: ...be fitted in the cold water inlet to facilitate draining of the cylinder Not supplied IMPORTANT ENSURE THAT THE IMMERSION HEATER THERMOSTAT IS SET TO A MAXIMUM OF 60 C Figure 7 Immersion Heater Conne...

Page 13: ...ions 13 5 2 Fitting the Twin Thermostat Figure 8 Cylinder Thermostat and Thermal Cut Out Connections Insert probes through hole in housing Secure front face using self tapping screws provided Housing...

Page 14: ...ipework must be continuous and the pipe should terminate in the gully or be bent backwards onto an outside wall in a place where discharge cannot be injurious to persons Figure 9 Tundish Installation...

Page 15: ...h should terminate in a safe place where there is no risk to persons in the vicinity of the discharge Examples of acceptable discharge arrangements are To a trapped gully with the end of the pipe belo...

Page 16: ...ALLIC RAINWATER GOODS MAY BE DAMAGED BY SUCH DISCHARGES Take necessary precautions Metal discharge pipe D1 from temperature relief valve to tundish Sleeved through wall Discharge below xed grating Fix...

Page 17: ...the performance of the unit If no de scaler or softener is used then the heating elements will require periodic de scaling for maximum efficiency and to prevent damage 8 3 User Instructions Your Elem...

Page 18: ...nt This product should be serviced regularly to optimise its safety efficiency and performance The service engineer should complete the relevant Service Record on the Benchmark Checklist after each se...

Page 19: ...air gap needs replenishing Follow steps listed in Servicing maintenance section Only cold or lukewarm water comes out of taps Programmer set to heating only or not switched on for hot water Set progra...

Page 20: ...rrent at the time of installation EU standards and is not fed with water from a private source It had not been modified in any way It has not been subjected to excessive pressure or electrolytic actio...

Page 21: ...t packaging Observe national regulations 12 2 Cylinder disposal You must not dispose of the cylinder or any of its accessories in normal domestic rubbish The cylinder and accessories must be disposed...

Page 22: ...Dutypoint Limited Shepherd Road Gloucester GL2 5EL United Kingdom T 44 0 1452 300592 W www dutypoint com...

Reviews: