600
60
0
2250*
0
1
2
L
N
PE
Electrical installation
*
or the height of
the highest shower
head / water outlet
that is permanently
installed, depending
on which is higher
Safety areas in accordance with DIN VDE 0100-701
76xxxx xx x xx xx00: 50 Hz, 220 - 240 V AC
76xxxx xx x xx xx06: 60 Hz, 220 - 240 V AC
I
N
= 16 A
I
ǻ1
P$
Power supply
Fuse protection
RCD
Pre-installation
> Installing a permanent power supply line:
ιϟ
Pre-connect a separate fuse and
residual current operating device (RCD)
ιϟ
Pre-connect an all-pole separating main switch out-
side the prescribed safety areas (0 - 2)
ιϟ
Allow the supply line to protrude by 3,000 mm
> Laying the potential equalisation cable:
ιϟ
Allow the cable to protrude by 3,000 mm
17
Connecting the whirltub (Diagram 17)
NOTE! Avoiding any malfunctions!
ιϟ
Do not fasten the cables together with cable ties.
ιϟ
Do not install the supply line parallel to the control
cables.
I
Connect the supply line to the mains supply
socket.
II
Connect the potential equalisation cable to the
whirltub.
I
II
WH_M_with integrated Panel/17.05.4
7
en
Summary of Contents for Happy D.2 7 0316 Series
Page 58: ...17 58 B0BZLWK LQWHJUDWHG 3DQHO 600 600 2250 0 1 2 L N PE 17 I II ar ...
Page 61: ...1 2 3 4 5 6 7 WH_M_with integrated Panel 17 05 4 61 10 1 2 2 8 ...
Page 62: ...62 WH_M_with integrated Panel 17 05 4 15 14 13 12 11 10 9 16 17 70 70 85 0 Ø 8 ...
Page 63: ...WH_M_with integrated Panel 17 05 4 63 20 22 19 18 21 23 25 24 26 ...
Page 64: ...64 WH_M_with integrated Panel 17 05 4 27 ...
Page 65: ......
Page 66: ......
Page 67: ......