Duratuf Smart store SS1507 Assembly Instructions Manual Download Page 9

 

 

ASSEMBLE BACK PANEL 

SELECT: 

 

3 x 1.810m Wall Sheets 
1 x 1.520 m Top Plate (Red) 
1 x 1.520 m Bottom Plate (Green) 
36 x 30mm Galv Clouts 
4 x Rivets 

STEP 1: 

 

 

Lay out 1 x Top Plate and 1 x Bottom Plate on a 
flat surface as shown (corner cut outs to face in-
wards).  

STEP 2: 

 

 

Place 3 x 1.810 m wall sheets on top of timber 
Plates with bottom of sheets flush with each oth-
er.  

 

 

Rivet the sheets together on overlaps as shown

STEP 3: 

 

 

Nail the wall sheets to the Top Plate at each end making sure 
that the top of the sheets are flush with the top of the Top 
Plate and that the sides of the wall sheets overhang the Top 
Plate by 

15mm

 as shown. 

 

 

Check that the Top Plate is straight then nail wall sheets to 
the Top Plate, using two clouts per pan.  

STEP 4: 

 

 

Nail the wall sheets to the Bottom Plate at each end,  

     ensuring that each side of the wall sheets overhangs the                           

Bottom Plate by 

15mm

 and that the distance between  

     the Top and Bottom Plates is correct. (As shown) 
 

 

Check that the Bottom Plate is straight then nail   

     wall sheets to the Bottom Plate, using two clouts per pan

.

 

Std Shed — Bottom Plate will protrude below wall sheet by 
approximately 10mm.  
 
Raised base plate shed — Wall sheet will protrude below 
the Bottom Plate by 20mm

IMPORTANT—IF YOU CHOOSE TO RAISE YOUR TIMBER 
BASE PLATE –READ THE FOLLOWING; 

 

For sheds with Raised Base Plate option only (see page 5), deduct 
30mm from measurement shown between Top and Bottom Plates on 
all wall panels, so cladding protrudes 20mm below bottom plate

BOTTOM PLATE 

1776mm 

1776mm 

TOP PLATE 

15mm 

15mm 

TOP PLATE 

BOTTOM PLATE 

TOP PLATE 

BOTTOM PLATE 

15mm 

15mm 

1776mm 

1776mm 

TOP PLATE 

Summary of Contents for Smart store SS1507

Page 1: ...ASSEMBLY INSTRUCTIONS SS1507 BASE SIZE 1 520m x 0 685m...

Page 2: ......

Page 3: ...ladding used in Smartstore Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as soon...

Page 4: ...m 2 Roof 0 885 m 3 Barge 0 885 m 2 Punched Full Sheet for Door 1 810 m 1 Padbolt Support 0 195 m 1 TIMBER Spouting 1 550m 1 Bottom Plates H4 Green Front Back 1 520 m 2 Bottom Plates H4 Green Sides 0 6...

Page 5: ...Wall Sheet Door Jambs Front 3 4 Wall Sheet Door Sheet Door Side Flashing Padbolt Support Hinge Door Top Bottom Channel QUICK OVERVIEW 1 LAY FOUNDATION 2 ASSEMBLE DOOR 3 ASSEMBLE SIDE PANELS 5 ASSEMBL...

Page 6: ...oming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bott...

Page 7: ...or side flashings and assemble door as shown Drill and rivet as per diagram ensuring rivets penetrate into door sheet fig 2 fig 1 STEP 2 Attach hinges to door side channel using rivets provided Using...

Page 8: ...the Top Plate is straight then nail along the wall sheet to the Top Plate two clouts per pan see fig 1 STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring each side of wall sheets ove...

Page 9: ...ate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the...

Page 10: ...rivets STEP 3 Place 2 x Wall Sheets on timber Make sure the narrow pans are next to the door Ensure that the top of the sheets are flush with the top of the Top Plate and that the sides of the wall s...

Page 11: ...ort the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 8 x 40mm screws screw the Top and Bottom Plates together STEP 2 Repeat Step 1 with...

Page 12: ...lots at front Rivet sheets together at overlaps with 1 x rivet per join STEP 2 Position the Roof Sheets with front overhang of 130mm at each front end fig 1 Using 4 x 40mm weatherseals nail the Roof S...

Page 13: ...e Bottom Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm na...

Page 14: ......

Page 15: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Reviews: