Duratuf SL1520 Assembly Instructions Manual Download Page 14

 

 

SECURING SHED

 

Secure your shed using Treated Timber Pegs or a Bolt Down Kit

 

TIMBER PEGS—WOODEN FLOOR

 

 

• 

The optional Duratuf Timber Peg Down Kit includes six H5 treated timber 
pegs that can be hammered into the ground and then attached to the 
Base Plate with stainless steel screws. A Sentry timber floor can then be 
fitted on top of the Base Plate if required.

 

BOLT DOWN KIT—CONCRETE

 

 

• 

The optional Duratuf Bolt Down Kit includes 6 x galvanised 
brackets, screws and  dynabolts.

 

 

• 

Space the brackets evenly around the shed and fix to the Bottom 
Plate and the concrete slab. A 10mm masonry drill bit is required.

 

IMPORTANT—

 

CLEAN UP

 

 

REMOVE ALL DRILL FILINGS FROM ROOF, WALLS AND CHANNELS THOROUGHLY. FAILURE TO DO THIS 
WILL RESULT IN CORROSION AND COULD THEREFORE VOID THE WARRANTY

.

 

FIT PADBOLT

 

 

• 

Rivet Padbolt to door and keeper onto Door Jamb as 
shown.

 

13

 

YOUR DURATUF SENTRY SHED IS NOW COMPLETE. RELAX

…...

 

FITTING A SENTRY FLOOR KIT (OPTIONAL)

 

 

• 

Position the Floor Joists equally between the side Base 
Plates and skew nail each end with two 75mm nails.

 

 

• 

Check that the shed is sitting level and square . Check 
that the diagonal Bottom Plate measurements are the 
same. This ensures that the shed base is square.

 

 

• 

Place the Floor Boards in position. (You may need to cut 
the last Floor Board to the correct width using a Skill 
Saw.) Nail each Floor Board in, using two 50mm nails 
each end and two nails into each floor joist. 

 

FRONT BASE PLATE

 

BACK BASE PLATE

 

JOIST

 

JOIST

 

Summary of Contents for SL1520

Page 1: ...ASSEMBLY INSTRUCTIONS SL1520 BASE SIZE 1 520m x 2 020m...

Page 2: ......

Page 3: ...e process needs to be adhered to to qualify for the steel warranty of your Duratuf Sentry shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as...

Page 4: ...2 Side Wall Angle 1 875m 2 Roof 2 200m 3 Door Sheet Narrow 1 940m 2 Door Sides 1 940m 2 Door Jamb 1 980m 1 Corner Door Jamb 1 980m 1 Door Brace 1 200m 2 Barge 2 200m 2 Spouting 1 555m 1 Door Top Botto...

Page 5: ...ARTS LIST DESCRIPTION QTY DIAGRAM Front Back Bottom Plates H4 Green 1 520 m 2 Front Back Top Plate H1 Red 1 520 m 2 Side Wall Bottom Plates H4 Green 2 020 m 2 Side Wall Top Plates H1 Red 2 022m 2 PACK...

Page 6: ...DE PANELS 1 LAY FOUNDATION 2 ASSEMBLE DOOR QUICK OVERVIEW Top Plate Back Side Wall Sheets Barge Flashing Spouting Roof Sheets Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back W...

Page 7: ...ough from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom plate...

Page 8: ...nd assemble door as shown ensuring narrow face of flashing is on front as per fig 1 STEP 4 On the back of the door place door braces in posi tion as shown in fig 4 Ensure that the top and bottom ends...

Page 9: ...p of timber plates with bottom of sheets flush with each other Rivet sheets together on overlaps as shown STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top of the sheets ar...

Page 10: ...th bottom of sheets flush with each other Rivet the sheets together on overlaps as shown STEP 3 Nail the wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with...

Page 11: ...plates ensuring wall sheets fit underneath door jamb flashings Ensure that the top of the sheet is flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by 1...

Page 12: ...panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel as shown Using 2 x 40mm screws screw Top Plates together in the corner Using 2 x 40mm screws 2...

Page 13: ...all Sheets fig 2 STEP 3 Ensure the Front and Back Top Plates are straight Screw the roof sheets to the front back Top Plates using 1 x Roofing Screw per rib fig 2 STEP 4 Place barge flashings on roof...

Page 14: ...UP REMOVE ALL DRILL FILINGS FROM ROOF WALLS AND CHANNELS THOROUGHLY FAILURE TO DO THIS WILL RESULT IN CORROSION AND COULD THEREFORE VOID THE WARRANTY FIT PADBOLT Rivet Padbolt to door and keeper onto...

Page 15: ......

Page 16: ...less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fasten...

Reviews: