MK1 FIXED WINDOW (Optional)
9
Step 2:
On the left hand side of the front wall fit
Corner Flashing (101) over Door Jamb
Flashing and rib . With top of the Corner
Flashing flush with the top of the Top
Plate, rivet in place using six rivets.
Step 1:
Lay out the two window studs (883mm) and
Nog (590mm) on a flat surface. Position
Nog and nail in place using two 75mm nails
at each end.
570mm
Step 6:
From the outside of the shed, place glass
in Window Frame. Attach a Glazing Bead
(G100) with three rivets to each side of the
Window Frame to hold glass in place. Pre-
drilling Glazing Beads is recommended.
Follow Steps 2 - 5 on page 8.
MK1 DOOR JAMB & CORNER FLASHINGS
Step1:
Fit Door Jamb Flashing (104) in between
Top and Bottom Plates and hard against
Stud. Attach Door Jamb Flashing with
three rivets into Rib on the outside and
three 30mm clouts into studs on the in-
side. Repeat with the other Door Jamb.
DOOR JAMB
STUD
PLATE
CORNER
FLASHING
FRONT PLATE
CLADDING
END