background image

 

 

fig.3

 

ASSEMBLE DOOR

 

7

 

SELECT:

 

 

3 x 1.850 m  Door Sheets (Narrow)

 

2 x 0.945 m  Door Top/Bottom Flashings

 

2 x 0.495m Door Top/Bottom Flashings

 

4 x 1.850m Door Side Flashings

 

2 x 1.160m  Door Brace Flashings

 

2 x 0.915m Door Brace Flashings

 

6 x Hinges

 

1 x Padbolt Support Flashing

 

2 x 1.180 m  Door Brace Flashings

 

108 x Rivets

 

STEP 1:

 

 

• 

Lay out door sheets on a flat surface 

making sure narrow pans are on the 

outside.

 

 

• 

Rivet sheets together in the centre en-

suring ends are flush with each other.

 

STEP 2:

 

 

• 

Position door side flashings and top 

and bottom flashings and assemble 

door as shown, ensuring narrow  

face of flashing is on the front as 

per fig.1

 

 

 

STEP 4:

 

 

• 

On the back of the door, place door braces in posi-

tion as shown in 

fig.4.

 

 

• 

Ensure that the top and bottom ends of the braces 

are under the door flashings as shown in 

fig.5 

and 

opposite ends of the braces overlap in the middle.

 

 

• 

Rivet door brace flashings onto back of door as 

shown. Where possible, rivet from front of door

.

 

STEP 3:

 

 

• 

Attach hinges to door side flashing using rivets provided. 

Ensure hinge is flush with back of door, and 60mm in from 

each end as per 

fig.2.

 

 

• 

Using six rivets, attach padbolt support as shown in 

fig. 3.

 

fig.2

 

NARROW PANS

 

SMALL DOOR:

 

 

• 

Assemble small door in same way as large door using 0.495 m top and bottom flashings. 

 

 

• 

Before screwing on 0.915m door braces, attach weather strip flashing to back of door side flashing using six rivets 

ensuring it protrudes 20mm out from door side.

 

 

Hinges

 

fig.1

 

fig.5

 

fig.4

 

Summary of Contents for Gurdian Sheds GG101

Page 1: ...ASSEMBLY INSTRUCTIONS GG101 BASE SIZE 3 190m x 3 020m...

Page 2: ......

Page 3: ...process needs to be adhered to to qualify for the steel warranty of your Duratuf Guardian shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as...

Page 4: ...1 920m 4 Side Wall Angle 1 980m 4 Side Wall Angle 2 040m 4 Roof 1 600m 12 Roof 1 Pan 1 600m 2 Door Sheet Narrow 1 850m 3 Door Sides 1 850m 4 Door Jamb 1 890m 2 Door Brace 1 160m 2 Door Brace 0 915 2...

Page 5: ...CRIPTION QTY DIAGRAM CHECKED Front Back Bottom Plates H4 Green 3 190 m 2 Front Back Top Plate H1 Red 3 190 m 2 Side Wall Bottom Plates H4 Green 3 020 m 2 Side Wall Top Plates H1 Red 3 020 m 2 Ridge Be...

Page 6: ...Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back Wall Sheets 6 Sheets 1 x 1Pan Sheet Front Wall Sheets 1 Sheet 1 x 1Pan Sheet Door Jambs Front Wall Sheet x 2 Door Side Flashing...

Page 7: ...hrough from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom plat...

Page 8: ...g 1 STEP 4 On the back of the door place door braces in posi tion as shown in fig 4 Ensure that the top and bottom ends of the braces are under the door flashings as shown in fig 5 and opposite ends o...

Page 9: ...e wall sheet overhang the Top Plate by approx 15mm as shown Check that the Top Plate is straight then nail the Wall sheet to the Top Plate 2 clouts per pan see fig 1 Standard Shed Bottom Plate will pr...

Page 10: ...wall sheets to the Top Plate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and tha...

Page 11: ...by 15mm as shown Nail wall sheets to Top Plate two clouts per pan Nail the wall sheets to the Bottom Plate making sure that the Plates are the correct distance apart and that the sides of the wall sh...

Page 12: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Page 13: ...90 m Ridge Beam 2 x 0 200 m Jack Studs 8 x 75mm Screws 36 x 50mm Roofing Screws 74 x Rivets 44 x 50mm Clouts 12 JACK STUD TOP PLATE RIDGE BEAM fig 1 fig 2 STEP 2 Position the first Roof Sheet so that...

Page 14: ...l holes using a 3 5mm drill bit Use Roofing Screws on all other ribs and pans Ensuring screws are not overtightened as this can damage the seal and cause the shed to leak fig 1 SIDE WALL FRONT WALL BA...

Page 15: ...h end with two 75mm nails Check that the shed is sitting level and square Check that the diagonal Bottom Plate measurements are the same This ensures that the shed base is square Place the Floor Board...

Page 16: ...less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Faste...

Reviews: