![DURAG D-R 290 Operating Manual Download Page 80](http://html.mh-extra.com/html/durag/d-r-290/d-r-290_operating-manual_2541137080.webp)
5 | Installation
80
D-R 290
1
Service connection
(mini-USB)
2 External 4-20 mA temperature
transmitter (4-pin M12 socket)
(
option)
3
Main connection plug
4 Protective device measuring head
(8-pin M12 socket)
5
Protective device reflector
(8-pin M12 socket)
Fig. 5.12: Connection plugs and sockets on the underside of the housing
From left to right, these are:
1. Mini-USB socket for connecting a PC, laptop or tablet to the
.
2. In a special version, a 4-pin M12 socket for connecting a 4-20 mA temperature
sensor for measured value standardisation.
3. Main connecting plug for the supply via D-TB 100 or D-ISC 100.
4. 8-pin M12 socket for connecting a purge air sensor and protective device (fail-safe
shutter) for the measuring head.
5. 8-pin M12 socket for connecting a purge air sensor and protective device (fail-safe
shutter) for the reflector.
The D−TB 100 supply unit
or the control unit D−ISC 100 is connected at the main connecting plug (item 3 in
). This connection is described in section
5.6.1 Connecting the supply and
The connection of the protective device for the measuring head at the socket item 4
(
) and the protective device for the reflector at the socket item 5 is described
in sections
5.5.4 D-SK AE electrical connection [
The connection of the external 4-20 mA temperature transmitter at the socket item 2 is
7.7.10.2 Temperature compensation via
an external temperature transmitter (special variant) [
Meaning of the LEDs
At the side of the measuring head casing there is a viewing window allowing 4 LEDs
to be viewed. The signals of these LEDs have the following meaning:
5.4.6
Summary of Contents for D-R 290
Page 12: ...12 D R 290 ...
Page 18: ...1 General 18 D R 290 ...
Page 20: ...20 D R 290 ...
Page 28: ...2 Safety 28 D R 290 ...
Page 30: ...30 D R 290 ...
Page 38: ...3 Delivery 38 D R 290 ...
Page 40: ...40 D R 290 ...
Page 60: ...4 Product description 60 D R 290 ...
Page 106: ...106 D R 290 ...
Page 152: ...152 D R 290 ...
Page 174: ...8 Maintenance 174 D R 290 ...
Page 176: ...176 D R 290 ...
Page 178: ...9 Appendix 178 D R 290 Fig 9 2 Measurement point questionnaire 2 ...
Page 194: ...9 Appendix 194 D R 290 ...
Page 200: ...11 Index 200 D R 290 ...
Page 202: ...GmbH Kollaustraße 105 22453 Hamburg Germany www durag com ...