Once 3-4 panels are installed, check to make sure all the posts and panels are still horizontal. If
correction is needed, use a rubber mallet while the concrete is still soft.
After concrete has set, fasten the fence section to the posts by using #8 x 1" self-tapping screws.
Be careful not to over-tighten the screws as the heads may be broken off or stripped out.
We’re happy to help. Call
1-866-719-5782.
7
Step 5
Step 6
Panel
Install
ation