7.
Padlock Handle
: Next the Padlock Handle can be installed. Put the shaft of the padlock handle
through the punch in the door and secure the handle using (4) one-way security screws and (4)
nylock nuts.
8.
Upper Lock Bar Prep
.: Now the CAM and lock bars can be installed. The upper lock bar must be
inserted into the guide at the top of the door before the CAM can be installed.
9.
Lock CAM
: The CAM slides onto the padlock handle shaft after a nylon washer (.75 OD x .50 ID x
.06 THK), insure the orientation of the CAM is correct otherwise the unit won’t lock properly.
Next secure the CAM using a zinc washer (.438 ID x 1 OD x .083 THK) and cotter pin (bend the
legs of the cotter pin once inserted to keep it snug).
Summary of Contents for Bike locker DL1
Page 1: ......