Windsor Arbor
4
With arbor panels lying down and screw pilot
holes of each arbor panel facing out, slide two
arbor top rails (part 6) all the way through both
routed holes at the top of each arbor panel.
Note: 2” sq. holes should line up with 2” sq.
holes in the top of the arbor panels. This will
leave 7” of overhang on each side of the arbor.
Insert five arbor top cross rails (part 8) into
arbor top rails and arbor panel posts by carefully
separating posts just enough to insert the five
rails. When inserting rails, insert with screw
pilot holes facing up.
Note: Outer two arbor top cross rails are
inserted into posts, and then lock into the arbor
top rail.
Using 1½” kappet screws, screw together both
arbor panels. Be sure that all parts are fully
inserted into posts before securing. Snap
kappet screw caps over screw heads.
5
6
7