background image

   Model#

11196

Assembly Instructions

Part #

Description

1

4" sq. x 93" Left Post

1

2

4" sq. x 93" Right Post

1

3

⅞ x 1½ x 35" Top/Bottom Cross Rail

1

4

⅞ x 1½ x 35" Center Cross Rail

1

5

¼ x 1½ x 66" Vertical Slat

1

6

1½ x 5½ x 96" Arbor Top Rail

1

7

⅞ x 3 x 46½" Arbor Top Cross Rail

1

8

4" sq. New England Post Cap

2

9

1½ x 5½" Arbor Top End Cap

2

10

24" Steel Ground Anchor (U-shaped)

1

11

Hardware Bag

2

⅞ x 3"Arbor Top Cross Cap

PLEASE READ THROUGH BEFORE BEGINNING ASSEMBLY.

2" Painted Screw

IMPORTANT:  Check boxes for Contents Listed

#8 - 1" Painted Self Tapping Screw

Check inside of parts as some parts are packaged

Super Glue Tube

inside of others

In the event of missing, damaged or defective parts

please call our customer service dept. at 1-877-258-6020

or e-mail [email protected]

When assembling components, place on a clean, flat

non-abrasive surface to avoid scratches

… Battery or Electric Drill 

 with #2 phillips bit

… Tape Measure

… Hammer or Rubber Mallet

 (recommended)

… Shovel or Post Hole Digger 

(recommended)

… PVC, Super, or Crazy Glue

150 Birch Road

P.O. Box 122

Sheboygan Falls,  WI  53085

[email protected]

Tools Required

1-877-258-6020

1

4

General Information

1

16

www.dura-trel.com

40

8

2

4

4

8

2

12

8

2

4

Qty

2

Newcastle Arbor

Reviews: