Dunkirk 3ES1 00C Installation & Operation Manual Download Page 20

Summary of Contents for 3ES1 00C

Page 1: ...O L F REDCAST RONSTF AM BO Installation Operation RepairParts Theseinstructions mustbeaffixedonoradjacent to theboiler DUNKIRKBOILERS DUNKIRK NEWYORK14048 716366 5500 MEMBER The llydronies Institute...

Page 2: ...NCHES A B C 16 7 9 16 7 9 16 7 9 20 8 11 20 8 11 20 8 11 BTUH British Thermal Unit Per Hour GPH _ Gallons per Hour Oil at 140 000 BTU per Gallon Heating Capacity is based on a 13 CO2 with a 02 w c dra...

Page 3: ...e vaporsandliquids This boiler has been designed for residentialinstallations If used for commercial applications alljurisdictionalrequirements must be met This mayrequirewiringandlor pipingmodificati...

Page 4: ...bustible material onallsidesandabove Allowat least24 frontclearance for servicing Allowat least18 leftsideclearance for servicing boilersequipped with atankless coil 5 FRESH AIRfor combustion mustbeav...

Page 5: ...nchesof the bottom of theenclosure See Figure 4 Example Your boiler is rated at 100 000 Btu per hour The water heater is rated at 30 000 Btu per hour The total is 130 000 Btu per hour You need two gri...

Page 6: ...ardwithlimeor otherdeposits whichwillaccumulate insidethecoil Forsummerrunningwithcoilyou needto fill boilerwithwaterandaddthe L6006limitcontrolto the coil Thiswill maintain watertemperature in the bo...

Page 7: ...directlyto a drain but leave an air gap No shutoffof any description shallbeplacedbetween the popsafetyvalveand the boiler or ondischargepipes between suchsafetyvalvesandthe atmosphere Installation of...

Page 8: ...keoffs must neverbe between tworisers 6 System takeoffsfromtheheadermustneverbe bull headed Ifthesteam maingoesintwodirections theremustbetwotakeoffs fromtheheader onefor eachmain 7 All boilersingravi...

Page 9: ...pplyto thewaterinletvalve makesure thata deanwatersupplyis available Whenthewatersupplyis froma wellor pump asandstrainer shouldbeinstalled atthe pump FORUSEWITHCOOLINGUNITS A This boiler when used in...

Page 10: ...Systems andApplications Hand book Chapter30 Chimney GasVentandFireplace Systems ortheNational Standard for Chimneys Fireplaces VentsandSolidFuelBurningAppliances ANSI NFPA 211 CHIMNEY CONNECTOR ANDDRA...

Page 11: ...sure to sendthe steamoutto the furthestradiator andnot go overtheoptimum steampressure thatisrequired at theradiators 67D t LOWWATERCUT OFF Thefloat type lowwatercut offshutsofftheburnerwhenthewaterle...

Page 12: ...temmustbedoneseveral timesto removeall oil greaseandsediment Thereshouldbe a teewitha plugpipedto thesupplylineof theboilerinorderto properlyskimthe boiler Wheneverthe waterin the glassgaugebecomesdis...

Page 13: ...eflue collector Removefluecollectortop Cleanpassageways betweensections witha flexiblehandlewire brush Removedirt fomthe bottomof the boiler and reassemble all parts Be sure vent pipeconnections to ch...

Page 14: ...ation forcracking and deterioration If thereis anysignsof cracking or deterioration replace beforereassembling the boiler 12 Removesootfromfiresidesurfaces by brushingdiagonally throughthe flue passag...

Page 15: ...e burner adjusted S_ort r_cting too frequent off and on of bu ner will cause s aoti_ _f_r ar_df or burner bec_e dirty at frequent in_ervaJs dter eorreotino Itre drt conditior_ also correct _he n_ro_se...

Page 16: ...GROUND LINE VOLTAGE NEUT LEAD _PRESSURETROL TO LWC O HARNESS PART NO 433 00 873 OIL BURNER PRIMARY RELAY OPTIONAL LOW LIMIT CONTROL FOR BOILERS WITH TANKLESS COIL z z TO 24v THERMOSTAT LOW VOLTAGE WiR...

Page 17: ......

Page 18: ..._p_r_ Tsr_kle_ _i_ K_t4340_14 ir_l _s coJ_ _8 and b_l_ 4 L_...

Page 19: ...1 _69BI0...

Page 20: ...3 5 4 25 F5 4ES1 50 C 1 25 60 W 1 50 160 1 5 2 60 FIO 4ES1 75 C 1 50 60 W 1 75 145 1 5 3 25 FIO 4ES1 85 C 1 50 60 W 1 85 160 2 0 3 40 FIO FOR CARLIN EZ OIL BURNER SERIES BOILER NOZZLE I HEAD MODEL DE...

Reviews: