Max. Flow Setting

Initial Lift Adjustment

VALVE ADJUSTMENT

Max. Flow Adjustment (SV-DLE only)

• The SV-DLE is factory set with the max. flow adjustment   
    fully open.
 

Before making a max. flow adjustment, the valve 
should be properly piped in the application. 

• Locate the max. flow adjustment on top of the SV-DLE 
   (base of the hydraulic brake). There are two screws, the 
   holding screw is recessed and has a blue sealing  
   compound on it, while the pan head screw protrudes from 
   the cap.
• Loosen the pan head screw until you can freely rotate 
   the flow adjustment.
• Turn clockwise for less gas or counterclockwise for more 
   gas.
• Check the flow at the burner with an orifice or flow meter.
• Tighten the pan head screw on the adjustment cap after 
   adjustments are completed.

Initial Lift Adjustment (SV-DLE only)

The initial lift adjustment varies the initial gas flow through 
the valve as the valve seat begins to open. This adjustment 
can allow the initial gas flow to 0 % and 70% of the total 
gas flow; 0 to 25% of stroke, within 1 second. All SV-DLE 
valves are factory set with no initial lift (100% slow opening). 
To adjust the lift proceed as follows:
• Unscrew the small black cap on top of the flow 
   adjustment cap to expose the initial lift adjustment knob.
• The black cap also serves as tool; turn the cap over and 
   insert it on the slot on the adjustment knob.
• Turn the knob clockwise for a min. initial lift or 
   counterclockwise for a max. initial lift.
• Once the desired initial fast lift has been achieved, 
   reinstall the black cap.

Do not adjust or remove any screws or bolts which 
are sealed with a Red colored compound. Doing so 
will void all approvals and warranties.

WIRING

Wiring the SV-(DLE)

• Disconnect all power to the valves before wiring to
   prevent electrical shock and equipment damage.
• Do not exceed the electrical ratings given in the 
   specifications and on the valve.
• Attach flexible 1/2” NPT conduit to the DIN connector.
• Route the wires through the conduit and the DIN
   connnector.

• Use 14 or 16 guage wire rated for at least 75˚C (167˚F).
• Connect the wiring to the appropriate screw terminals in 
   the DIN connector.
• Plug the DIN connector onto the terminals. Fasten 
   the DIN connector with the screw supplied.
  

CAUTION: All wiring must comply with local 
electrical codes, ordinances and regulations. 