dun-bri GROUP DBG 308.032 Installation And Operating Instructions Download Page 2

www.dun-bri.com

+44 (0)1763 274185

[email protected]

Dun-Bri Group, Watermill Industrial Estate, Aspenden Road, Buntingford, Hertfordshire, SG9 9JS, United Kingdom

DBG R65 ALUMINIUM 12-LED 
DIRECTIONAL WARNING MODULE

! WARNING ! - Do NOT look directly at the LEDs when in operation to prevent damage to your eyes.

10 FLASH PATTERNS

01

Single Flash (Alternating Group 1 / 2)

06

Double Flash

02

Double Flash (Alternating Group 1 / 2)

07

Quad Flash

03

Quad Flash (Alternating Group 1 / 2)

08

Five Flash

04

Five Flash (Group 1) / Quad Flash (Group 2)

09

Quad Flash (Group 1) / Steady On (Group 2)

05

Single Flash (ECE R65 Approved)

10

Steady On

WIRING DIAGRAM

Latching Switch (On/Off)

+VDC

(RED WIRE)

Ground

Battery

ALT SYNC (GROUP 1)

GREEN WIRES (+)

Fuse (Required)

Supplied with 190mm length of cable
Fuse and switches NOT supplied

Momentary Switch (Change Flash Pattern)

(Not Connected)

ALT SYNC (GROUP 2)

GREEN WIRES (+)

SYNC

BLUE WIRE (+)

-VDC

(BLACK WIRE)

SYNCHRONISATION INSTRUCTIONS - Ensure 
all modules are set to the same flash pattern. 
Connect blue wires of all modules together.

ALTERNATE FLASH INSTRUCTIONS - Ensure 
all modules are set to the same flash pattern.

For GROUP 1: Connect all green wires to the 
+VDC.

For GROUP 2: Do not connect green wires. 
Unconnected wires must be sealed to 
prevent any water ingress.

TO CHANGE FLASH PATTERNS - Apply blue 
wire to the +VDC between 0.5 - 2 seconds. 
Applying for 2.5 seconds will revert back to 
the first pattern. A simple momentary switch 
will be sufficient.

Summary of Contents for DBG 308.032

Page 1: ...IMPORTANT Read all instructions before installing and operating the module This module must be installed by a qualified automotive technician Failure to do so may void your warranty v1 0 308 032 Voltage Range 10 30V LED Colour Amber Number of LEDs 12 Mounting Pedestal Bracket Mount Flash Patterns 10 Connection Fly Lead Syncable Yes with alternating sync Approvals ECE R65 Class I ECE R10 IP Rating ...

Page 2: ...RAM Latching Switch On Off VDC RED WIRE Ground Battery ALT SYNC GROUP 1 GREEN WIRES Fuse Required Supplied with 190mm length of cable Fuse and switches NOT supplied Momentary Switch Change Flash Pattern Not Connected ALT SYNC GROUP 2 GREEN WIRES SYNC BLUE WIRE VDC BLACK WIRE SYNCHRONISATION INSTRUCTIONS Ensure all modules are set to the same flash pattern Connect blue wires of all modules together...

Page 3: ...RUCTIONS Carefully unpack and inspect the module and all accessories before installing to ensure there are no damaged or missing parts Plan all cable routing before attempting installation and ensure voltage compatibility Ensure there are no obstructions limiting visibility to traffic when mounting If the module slides or moves easily a proper installation has NOT been attained CAUTION Disconnect ...

Page 4: ...are hereby excluded and shall not apply to the product The buyer s sole and exclusive option in contract tort or any other practice against Dun Bri Services Ltd regarding the product and its use shall be the replacement or repair of the product as described LIMITATION OF LIABILITY In the event of liability for damages arising from this Limited Warranty or any other claim related to Dun Bri Service...

Reviews: