Page 39 of 45
25.
Installation & Commissioning Record
Site name and location: ..............................................................................................
Date: ............................................................................................................................
Name of person responsible for installation: ............................................................
Name of person responsible for health centre: .......................................................
1. Before Going to Site
•
Check your toolkit.
•
Check you have appropriate fixings.
•
Check you have appropriate spare parts.
•
Check the equipment is OK.
2. Site Inspection and Planning
STOP AND THINK
•
Select a suitable location for the refrigerator.
•
Select a suitable location for the solar array:
Check for orientation
– should be towards equator,
Check for shading between 7am and 5pm,
Check for ease of access (for installation and cleaning),
Check for length of cable to refrigerator.
•
You may need to negotiate with the user.
•
You may need to re-think the refrigerator location if the solar array
location is difficult.
•
Stop and think of other options before starting the installation work.
•
Make a sketch of the site showing the main features, and including a
plan of the rooms.
Please
or
insert value.