
7
Installation and Operation of: Front Line Merchandiser
Installation - continued
Step 7
Install Pilaster provided with the adjacent unit to
cover the gap between the units on the operator’s
side.
Step 9
Follow the décor panel instructions after the entire
lineup is installed and leveled.
Step 8
Install wire baskets into unit.
Step 5
Once unit is level, tighten bolts connecting bread
display and adjacent unit.
Step 6
Re-install cap cover removed in step 1