ducci XTREM DO 22 Instructions For Installation Manual Download Page 4

Dukab Yapı Malzemeleri San.ve Tic.Ltd.Şti

4

3.

In an empty area, place fixed

glasses into the channels of rail

profiles and glass profiles. To create

the frame, fix the glass profiles onto
the ends of the upper and lower rail

profiles with screws.

4.

Insert the glass profile on both

sides into the wall profiles.

Note: For glasses with pattern, always
make sure that the pattern is on the

outside.

Installation

Summary of Contents for XTREM DO 22

Page 1: ...Dukab Yap Malzemeleri San ve Tic Ltd ti Instructions for Installation T m Haklar Sakl d r XTREM DO 22 SL DE SYSTEM...

Page 2: ...o install the shower enclosure on a flat shower try or floor and on vertical walls Attention The dowels provided with this product are for ceramic walls only Plasterboards or erected walls may require...

Page 3: ...ere are even not less than 10 mm Use a water gauge to ensure that both of them are vertical 2 Making sure you do not move the wall profiles use a marker to mark the hole points on the wall Use a drill...

Page 4: ...f rail profiles and glass profiles To create the frame fix the glass profiles onto the ends of the upper and lower rail profiles with screws 4 Insert the glass profile on both sides into the wall prof...

Page 5: ...align the holes on the wall profiles with the dowels in the holes on the walls and use screws to fix them on the wall 6 After inserting and adjusting the profiles drill the glass and wall profiles an...

Page 6: ...to the rail channel On the lower section press on the spring loaded pin to insert the bearing rings into the profile channel Adjust the height using the pin screws on the upper bearings 7 Remove the s...

Page 7: ...way that there is no gap between the seals Installation method for water sealant Dukab Yap Malzemeleri San ve Tic Ltd ti 7 10 After the adjustments of magnetics and doors are complete you should plac...

Page 8: ...apply silicone sealant on the connection points outside the shower enclosure Note Before installation make sure that the environment is absolutely clean and dry 11 Thread the handle pins through the h...

Page 9: ...ion is done DO NOT USE scalant must be applied to the shower enctosure where it can be easily seen 14 The brand label must be applied to the desired area by removing the anti adhesive 15 Do not forget...

Page 10: ......

Page 11: ......

Page 12: ...merli Neigh Bur han Street No 15 1 Had mk y stanbul T rkiye T 90 212 435 65 77 90 212 435 97 46 F 90 212 435 96 81 info ducci com tr www ducci com tr All rights reserved FACTORY CENTRAL...

Reviews: