Issue 2
CONTENTS
Page
1.0
SAFETY
1
2.0
INSTALLATION
1
2.1
ELECTRICAL INSTALLATION
1
2.2
AC WIRING
1
2.3
DC WIRING
1
3.0
START GUIDE
1-2
3.1
DISPLAY PAGES
3
3.2
STATUS
3
3.2
INSTRUMENTATION
3
3.4
ALARMS
3
3.5
EVENT LOG
4
3.6
LCD INDICATORS
4
3.7
SCHEDULE
4
4.0
CONTROLS
4
4.1
MODE SELECTION
4
5.0
DISPLAY
5
5.1
LOAD SWITCHING CONTROL
5
6.0
OPERATION
5
6.1
AUTOMATIC MODE OF OPERATION
5
6.1.1 WAITING IN AUTO MODE
5
6.1.2 STARTING SEQUENCE
5
6.1.3 GENERATOR ON LOAD
5
6.1.4 STOPPING SEQUENCE
6
6.2
MANUAL OPERATION
6
6.2.1 STARTING SEQUENCE
6
6.2.2 GENERATOR OFF LOAD
6
6.2.3 GENERATOR ON LOAD
6
6.2.4 TRANSFER BUTTONS OPERATION
6
6.2.5 STOPPING SEQUENCE
6
6.3
TEST ON LOAD OPERATION
7
6.3.1 STARTING SEQUENCE
7
6.3.2 GENERATOR ON LOAD
7
6.3.3 STOPPING SEQUENCE
7
7.0
MODULE DISPLAY
7
7.1
BACKLIGHT
7
7.2
PROTECTIONS
7
7.2.1 GENERATOR
7
7.2.2 MAINS
8
7.3
PLANT BATTERY
8
8.0
SYSTEM TEST
8
9.0
FRONT PANEL CONFIGURATION
8
9.1
ACCESSING THE FRONT PANEL EDITOR (FPE)
9
9.2
EDITING A PARAMETER
9
9.3
ADJUSTABLE PARAMETERS (CONFIGURATION EDITOR)
9
9.4
SCHEDULER SETTING
10
10
CHECK LIST FOR AUTOMATIC OPERATION
10
11
WARRANTY
10
1 PHASE ATS WIRING (STEPHILL)
11
1 PHASE ATS WIRING 100A+ (ATS)
12
3 PHASE ATS WIRING DSE 333 (ATS)
13
3 PHASE ATS WIRING DSE 333 (STEPHILL)
14
ATS
– GENERATOR – MAINS INTERCONNECTION WIRING DSE 333
15
Summary of Contents for 333
Page 4: ...Issue 1 2 ...