background image

INSTALLATION / 

INSTALACIÓN

BEGINNING MOUNTING 

Step 1: Install your preferred speaker on the 
tower  by  connecting  the  speaker  cables 
inside and then securing it with the supplied 
mesh and screws.

Step 2: Find a GOOD location that allows for 
easy  wiring  of  the  speaker  (and  LED  lights) 
-PLUS  does  NOT  impair  your  movement 
around the location.

Step 3: Using the supplied 6mm hex wrench spin 
out the 4-M8 screw that holds the top clamp

Step 4: Drill 015 - 020 mm hole on mounting 
tube bottom align the clamp wire out hole.

Step  5:  Connect  the  speaker  wire  AMP  out 
and LED controller, Insulated lock the clamp 
to the tube.

Step 6: Cut the length of the rubber pad and 
wires outlet according to the diameter of the
installation pipe. 

Paso 1: instale su altavoz preferido en la torre 
conectando  en  su  interior  los  cables  para  el 
altavoz y luego asegurelo con la malla y los 
tornillos suministrados. 

Paso 2: Encuentre una BUENA ubicación que 
permita  el  cableado  fácil  del  altavoz  (y  las 
luces LED) - ADEMÁS QUE NO perjudique su 
movimiento alrededor de la ubicación.

Paso  3:  Con  la  llave  hexagonal  de  6  mm 
suministrada,
gire el tornillo 4-M8 que sujeta la abrazadera 
superior.

Paso 4: Perfore un orificio de 15ø - 20ø mm 
en  la  parte  inferior  del  tubo  de  montaje  y 
alinee  el  orificio  de  salida  del  cable  de  la 
abrazadera.

Paso  5:  Conecte  el  cable  de  salida  AMP  del 
altavoz y el controlador LED, trabe la abraza-
dera aislada al tubo.

Paso 6: Corte la longitud de la almohadilla de 
goma y la salida de los cables de acuerdo con 
el diámetro de la tubería de instalación.

COMENZANDO EL MONTAJE

Summary of Contents for CF-X6TP.NS

Page 1: ...R S MANUAL ENGLISH ESPA OL C PSULA DE TORRE MARINA PARA ALTAVOCES DE 6 5 CON MALLA LUCES LED RGB Y TEXTURA DE FIBRA DE CARB N MARINE TOWER POD FOR 6 5 SPEAKERS WITH GRILL RGB LED LIGHTS AND CARBON FIB...

Page 2: ...er IP65 Marine Grade Compliant Specifications 100 UV Stable Grill with Injection Molded Composite with 316 Stainless Steel mesh Integrated RGB LED Lighting LED Controller with Smartphone App LED BTC A...

Page 3: ...nga todas sus herramientas a mano taladro juego de llaves Allen engarzadores soldador pelacables tubo termo retr ctil etc 4 Utilice conectores a prueba de agua de alta calidad para una instalaci n con...

Page 4: ...ameter of the installation pipe Paso 1 instale su altavoz preferido en la torre conectando en su interior los cables para el altavoz y luego asegurelo con la malla y los tornillos suministrados Paso 2...

Page 5: ...Stop Washer 6 Core Wires 6 hilos de n cleo 1 0 RUBER PAD FOR TUBE 1 25 1 5 1 75 2 0 2 25 2 5 2 75 3 0 Step 7 Wrap the rubber pad around the pipe and align wire out hole According to the diagram Paso...

Page 6: ...gire el altavoz encaje al ngulo deseado una vez all bloquear los tornillos para evitar vibraci n y que se suelte la abrazadera Paso 9 Step 9 Step 11 During the mounting process you should have locate...

Page 7: ...e 30 grados FLAT MOUNTING Step 13 When you want to install a flat mounting remove the clamp and take out the 6 core through it into the flat mounting bracket then assemble it see depiction below Paso...

Page 8: ...tive BlueColorLight B connectedto batteryNegative PurpleColorLight R and B connected tobatteryNegative YellowColorLight R and G connected tobatteryNegative CyanColorLight B and G connected tobatteryNe...

Page 9: ...Rope Screw fastening Glue e l b a c n o c e j a t n o M s o d a r g 0 6 3 e d n i c a t o r n o c e j a t n o M 2 1 e l b a t s u j a n i s e r p a o d a e d l o M enterrado o con cable abierto Opcion...

Page 10: ...MEASUREMENT MEDIDAS 2 40 60 9mm 10 7 271 7mm 6 93 176 1mm...

Page 11: ...re information on our warranty policy Visita nuestra pagina web DS18 com para obtener mas informacion sobre nuestra garantia WARRANTY GARANT A MEASUREMENT MEDIDAS We LIKE IT LOUD 2 0 50 8mm To 1 0 25...

Page 12: ...FOR MORE INFORMATION PLEASE VISIT DS18 COM We LIKE IT LOUD V1...

Reviews: