background image

16

English

c o n c i s e

 

i n s ta l l at i o n

DRu Verwarming B.V.
The Netherlands
Postbus 1021, NL-6920 BA Duiven
Ratio 8, NL-6921 RW Duiven

959.023.04.

uk

uk

Summary of Contents for GLOBAL 70XT CF

Page 1: ...E n g l i s h Global 90 CF Global 70XT CF Concise installation Guide Please retain this document carefully Instructions for installation 959 023 04 UK uk UK...

Page 2: ...2 E n g l i s h concise installation Contents What do you need for installation 3 Steps to take 3 Disclaimer 3 Main parts 4 The six installation possibilities 5 Gas technical installation 8 UK...

Page 3: ...is always necessary in case of frameless installation Steps to take 1 Choose the installation that is applicable for this job 2 Check all necessary parts to be present 3 Follow the steps indicated in...

Page 4: ...4 E n g l i s h concise installation Main parts Burner Combustion chamber Spoiler on topside Convection box Frame B ta Debris shield Built in plaster trim Gas control box Flue spigot Frame Alpha UK...

Page 5: ...1 4 3 A B II Class 1 chimney linerless and frameless 1 Mount built in plaster frame on the convection box 2 Position convection box and fix to the wall 3 Mount debris shield 4 Gastechnical installati...

Page 6: ...ilt in plaster frame on the convection box 2 Position convection box and fix to the wall 3 Mount flex flue liner 4 Gastechnical installation then place cover panel A B IV Class 1 chimney with flex flu...

Page 7: ...4 1 Position convection box and fix to the wall 2 Mount flue pipe 100 3 Mount built in plaster frame on the convection box 4 Gastechnical installation then make chimney breast VI False chimney breast...

Page 8: ...t mount the 4 profiles of the plaster trim Profile with spoiler on top The studs should be in the center of the hole Gas supply pipe under bottom of gas control box Fix to wall Mount the convection bo...

Page 9: ...to convection box Mount gas control box to convection box Connect the flexible gas pipe to the gas suply with an elbow Connect the reciever to gas control Global 90 CF Connect the receiver to the gas...

Page 10: ...screws which were removed before Fix burner with screws Place debris shield linerless application only Pull through flex flue liner flue liner only Use the flat topped screws Linerless application on...

Page 11: ...in flue spigot flue liner only Place flue spigot in top of convection box in case of flue liner no debris shield Mount flue spigot with 2 screws Slide combustion chamber into convection box Put vermi...

Page 12: ...B ta frame only use the drilling jig to mark 4x drill spots see included installation sheet B ta frame only drill 4 holes and mount brackets on the drilled holes see included installation sheet Alpha...

Page 13: ...13 E n g l i s h concise installation Notities Notes Notizen uk...

Page 14: ...14 E n g l i s h concise installation 14 Notities Notes Notizen UK...

Page 15: ...15 E n g l i s h concise installation 15 Notities Notes Notizen uk...

Page 16: ...16 E n g l i s h concise installation DRU Verwarming B V The Netherlands Postbus 1021 NL 6920 BA Duiven Ratio 8 NL 6921 RW Duiven 959 023 04 uk UK...

Page 17: ...euerschalen und vieles mehr Kamin fen Pellet fen Holzherde und vieles mehr Sonderanfertigungen Pflege Reinigung Holzbearbeitung und vieles mehr Stark reduziert Markenprodukte im Sale Bereich und viele...

Reviews: