6. Unpacking and Installation
6.1 Unpacking
Once you have identified the place suitable for installation, open the packaging, remove the pump
and check to ensure that it has not suffered any damage during transportation and storage. The
packing material does not require special disposal precautions as it is in no way dangerous or
pollutant. For disposal, refer to local regulations.
6.2 Installation of the Pump
Place the pump and fasten it to its support by using the appropriate Ø9 mm holes (0.354 in),
with 2 suitable screws.
Assemble the pump in such a way that the cartridge housing and the bleed valve are easily
accessible.
Leave at least 100 mm (3.94 in) as a perimeter distance with respect to other equipment or
barriers to prevent access to the pump.
Assemble the pump at “labourer height” in order to prevent abnormal posture or possible
impact.
Do not install the pump submerged in liquids and/or in aggressive environments.
Do not install the pump in environments where there are explosive or flammable mixtures.
Do not install the pump near heat sources.
Verify that the grease used is fit for operating temperatures, especially at temperatures
below 0° C. If in doubt, contact our Sales Technical Office for the correct choice of
lubricant.
6.3 Hydraulic Connections
The connection with the hydraulic oil is marked with “A” and its size is G1/4”. The connection with
the lubricant outlet is marked with “B” and its size is G1/4”.