
Savannah Installation and Operation Manual
50
Note that secondary air tubes (B) can be replaced without removing the baffle board (A).
Important Notes:
The air tubes are identified for placement as follows:
Model
Type of tube
Savannah
Front
►
30 holes of 0.140"
Middle front
►
30 holes of 0.136’’
Middle rear
►
20 holes of 0.147’’
Rear
►
15 holes of 0.128’’
Summary of Contents for ElDorado
Page 8: ...Savannah Installation and Operation Manual 8 ...
Page 34: ...Savannah Installation and Operation Manual 34 Clearances for shield construction ...
Page 45: ...Savannah Installation and Operation Manual 45 Installation on the bottom AC01336 ...
Page 51: ...Savannah Installation and Operation Manual 51 Appendix 5 Exploded Diagram and Parts List ...