4
Cast iron flue collar installation:
1.
Peel off the tape from the back
of the gasket and attach the
gasket to the rope groove at
the back of the flue collar;
2.
Mount flue collar on top of the
stove. Make sure that the
damper holes on each side of
the flue collar are parallel to the
back of the stove;
3.
Fix the flue collar with the
hardware supplied;
4.
Install the flue damper inside
the flue collar as illustrated.
Back air intake, ash dump cap,
and firebricks installation:
1. Slide the back air intake(A)
behind the bracket welded on
the back of the stove;
2. Install the bottom firebricks
first, then the side ones;
3. Install the back firebricks;
4. Insert the ash dump cap on
the bottom hole.
(A)
Summary of Contents for COMPAK EPA EXEMPT
Page 11: ...10 MASONRY CHIMNEY Clay liner Thimble Clean out door ...
Page 12: ...11 FACTORY BUILT THIMBLE ...
Page 13: ...12 BRICK THIMBLE ...